Mireasa wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Targusor (Mireasa) (Phase 1)
Mireasa wind farm is an operating wind farm in Mireasa, Constanta, Dobruja, Romania.
Project Details
Table 1: Phase-level project details for Mireasa wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2015[1] | 50 MW[2] | Onshore[3] | Mireasa Energies [100%][1] | Monsson[3] |
2 | Operating[1] | 2018[1] | 10 MW[4] | Onshore[5] | Eco Power Wind SRL [100%][1] | Monsson[4] |
Location
Table 2: Phase-level location details for Mireasa wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Mireasa, Constanta, Dobruja, Romania[3] | 44.5, 28.35 (approximate)[3] |
2 | Constanța, Romania[5] | 44.4909, 28.3246 (exact)[5] |
The map below shows the locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20210909191127/https://www.transelectrica.ro/documents/10179/45094/7productie16.xls/8cac352d-676a-4fbb-9f11-30e8d56a1d4d. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126040545/https://www.romaniajournal.ro/business/monsson-groups-romanian-subsidiary-got-eur-43-m-from-china-development-bank/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240126111047/https://www.thewindpower.net/windfarm_en_18094.php. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20210909184729/https://www.monsson.eu/portfolio/ress-development/2010-mireasa-2-wind-farm-10-mw/. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20240126110913/https://www.thewindpower.net/windfarm_en_15881.php. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help)