Molzhaninovka power station (ГТЭС Молжаниновка) is a power station under construction in Moscow, Molzhaninovskiy, Russia.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Molzhaninovka power station | Moscow, Molzhaninovskiy, Moscow, Russia | 55.932727, 37.384364 (approximate)[1][2] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
1 | Construction[3][4][5][6][7][8] | fossil gas: natural gas[8] | 250[9] | gas turbine[5] | yes[4][9] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Infrastruktura Molzhaninovo OJSC [100%][8][10] | Vnesheconombank [100.0%] |
Background
In November 2012, it was reported that a court case has been initiated related to the theft of a government (ВЭБ) loan for the construction of the Molzhaninovka gas turbine power plant in the amount of 4.5 billion rubles. The police also found that the construction of the power plant was planned to be completed in December 2012; however, by 2012, only about 9% of the work has been confirmed by executive documentation.[11][12]
In August 2017, there were reports that the government has approved the revised project proposal for the construction of the plant.[13] The original proposal was for a combined cycle plant[14][15], but the most recent one was changed to a gas turbine unit. The proposed capacity was reported to be between 250 and 400 MW.[13] There have not been any developments related to this project since 2017.
A document, issued by the Government of Moscow in February of 2023, on gas supply of the City of Moscow until 2035, mentions that commissioning of the new power station had been delayed.[7] According to the latest image of the plant published in October 2023, construction had either been finished or was in its final stages.[16]
Articles and Resources
References
- ↑ https://energybase.ru/en/power-plant/gtpp-molzhaninovka.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220603063445/http://wikimapia.org/9307567/ru/%D0%A1%D1%82%D1%80%D0%BE%D0%B8%D1%82%D0%B5%D0%BB%D1%8C%D1%81%D1%82%D0%B2%D0%BE-%D0%B3%D0%B0%D0%B7%D0%BE%D1%82%D1%83%D1%80%D0%B1%D0%B8%D0%BD%D0%BD%D0%BE%D0%B9-%D1%8D%D0%BB%D0%B5%D0%BA%D1%82%D1%80%D0%BE%D1%81%D1%82%D0%B0%D0%BD%D1%86%D0%B8%D0%B8-%D0%93%D0%A2%D0%AD%D0%A1-%C2%AB%D0%9C%D0%BE%D0%BB%D0%B6%D0%B0%D0%BD%D0%B8%D0%BD%D0%BE%D0%B2%D0%BA%D0%B0%C2%BB. Archived from the original on 03 June 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210909161144/https://advis.ru/php/view_news.php?id=83C977A2-0C22-E242-8D91-393539B94E9B. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20210922221822/https://news.rambler.ru/other/37754087-glavgosekspertiza-rossii-odobrila-stroitelstvo-gtes-molzhaninovka/. Archived from the original on 22 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20220708171449/https://www.mskagency.ru/materials/2699269. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://okron.ru/articles/6572.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20240108204027/https://polinka.top/45173-jelektrojenergetika-kartinki.html. Archived from the original on 08 January 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 https://web.archive.org/web/20210616124914/http://en.evraziyskiy.ru/projects/restad/. Archived from the original on 16 June 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 https://web.archive.org/web/20210909170256/https://szemp.ru/raznoe/molzhaninovka-gtes.html. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210909175807/https://www.eprussia.ru/com/company/879.htm. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "Возбуждено дело о хищении кредита ВЭБа на строительство ГТЭС "Молжаниновка" в размере 4,5 млрд руб". Energorisk.ru. Nov 29, 2012. Retrieved Apr 25, 2022.
- ↑ "Кредит ВЭБа ушел в турбину". Kommersant. Nov 29, 2012. Retrieved Apr 25, 2022.
- ↑ 13.0 13.1 "Главгосэкспертиза России одобрила строительство ГТЭС «Молжаниновка»". Archived from the original on July 8, 2022. Retrieved July 13, 2022.
- ↑ "en.evraziyskiy.ru/projects/restad/". Archived from the original on June 16, 2021.
- ↑ "szemp.ru/raznoe/molzhaninovka-gtes.html". Archived from the original on September 9, 2021.
- ↑ [Based on the picture of the station, it has been already built or the construction is almost complete. "Электроэнергетика картинки"]. polinka.top. October 22, 2023. Retrieved December 6, 2023.
{{cite web}}
: Check|url=
value (help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.