Monteverde-Chorrillo LPG Pipeline

From Global Energy Monitor
Part of the
Global Oil Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Monteverde-Chorrillo LPG Pipeline is an operating NGL Pipeline in Ecuador that exclusively transports LPG.[1][2]

Location

The pipeline runs from the Monteverde Maritime Terminal in Santa Elena, to the Chorrillo Terminal in Guayas.[2]

Loading map...

Project details

  • Operator: EP Petroecuador[2]
  • Owner: EP Petroecuador[2]
  • Parent company: EP Petroecuador[2]
  • Capacity: 70,920 barrels per day[2]
  • Length: 124 km[2]
  • Diameter: 12 inches[1]
  • Status: Operating[2]
  • Start year: 2014[3]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

This pipeline transports LPG exclusively.[2] The pipeline begins in the Monteverde Maritime Terminal, which is also an LPG storage facility.[3]

Articles and resources

References

  1. 1.0 1.1 EP Petroecuador (March 2020). "Plan General de Negocios, Expansión e Inversión 2020" (PDF). EP Petroecuador. Retrieved February 26, 2024.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 EP Petroecuador (July 2023). "Plan General de Negocios, Expansión e Inversión de EP Petroecuador 2023" (PDF). EP Petroecuador. Retrieved February 2026. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. 3.0 3.1 "Visitamos a: Sistema de GLP Monteverde-Chorrillo". Ekos Negocios. Retrieved 2024-02-26.