Muara Juloi hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Muara Juloi hydroelectric plant is an announced hydroelectric power plant in Danau Usung Village, Murung District, Murung Raya Regency, Central Kalimantan Province, Indonesia.
Project Details
Table 1: Project details for Muara Juloi hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|
Announced[1] | 2027 (planned)[1] | 284 MW[2] | Conventional storage[1] | Korea Midland Power CO LTD (KOMIPO)[2] |
Location
Table 2: Location details for Muara Juloi hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Danau Usung Village, Murung District, Murung Raya Regency, Central Kalimantan Province, Indonesia[2] | Muara Juloi Water System River[1] | -0.6734, 114.6246 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://www.power-technology.com/marketdata/muara-juloi-hydro-power-plant-indonesia/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20221205154053/http://www.koreaherald.com/view.php?ud=20130401000961. Archived from the original on 05 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)