Muara Tawar power station is an operating power station of at least 2279-megawatts (MW) in Bekasi, West Java, Indonesia with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Muara Tawar power station | Bekasi, West Java, Indonesia | -6.0867, 106.9987 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 2, 3-0, 3-1, 3-2, 3-3, 4-0, 4-1, 4-2, 4-3, 5-1: -6.0867, 106.9987
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2][3] | fossil gas: natural gas[3] | 615[4][5] | combined cycle[6][4][7] | not found | 1997[6] |
2 | Operating[2][8][9][3] | fossil gas: natural gas[10] | 440[6][5][11][12] | combined cycle[6][4][3][13] | not found | 2022[6][8] |
3-0 | Construction[2][8][14][3][9] | fossil gas: waste heat from natural gas[10] | 250[11][12] | steam turbine[3][13] | not found | 2023[8][15] |
3-1 | Operating[2][5][3] | fossil gas: natural gas[3] | 140[4] | gas turbine[4] | not found | 2005[4] |
3-2 | Operating[2][5][3] | fossil gas: natural gas[3] | 140[4] | gas turbine[4] | not found | 2005[4] |
3-3 | Operating[2][5][3] | fossil gas: natural gas[3] | 140[4] | gas turbine[4] | not found | 2005[4] |
4-0 | Construction[2][8][14][3][9] | fossil gas: waste heat from natural gas[10] | 250[11][12] | steam turbine[3][13] | not found | 2023[8][15] |
4-1 | Operating[2][5][3] | fossil gas: natural gas[3] | 140[4] | gas turbine[4] | not found | 2005[4] |
4-2 | Operating[2][5][3] | fossil gas: natural gas[3] | 140[4] | gas turbine[4] | not found | 2005[4] |
4-3 | Operating[2][5][3] | fossil gas: natural gas[3] | 140[4] | gas turbine[4] | not found | 2005[4] |
5-1 | Operating[2][3] | fossil gas: natural gas[3] | 384[4] | combined cycle[4][7] | not found | 2010[4] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
2 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
3-0 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
3-1 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
3-2 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
3-3 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
4-0 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
4-1 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
4-2 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
4-3 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
5-1 | PT PLN Nusantara Power [100%][3] | PT PLN (Persero) [100.0%] |
Articles and Resources
References
- ↑ https://web.archive.org/web/20230103182122/https://datasets.wri.org/dataset/globalpowerplantdatabase. Archived from the original on 03 January 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 (PDF) https://web.archive.org/web/20220721024338/https://www.ptpjb.com/wp-content/uploads/2021/08/AR-PJB-2020-1.pdf. Archived from the original (PDF) on 21 July 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 3.32 https://web.archive.org/web/20220929142449/https://www.ptpjb.com/unit-pembangkitan/. Archived from the original on 29 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19 4.20 4.21 4.22 4.23 (PDF) https://web.archive.org/web/20221224155135/https://repit.files.wordpress.com/2013/04/gbu-pjb-pltgu-muara-tawar.pdf. Archived from the original (PDF) on 24 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 (PDF) https://www.plnindonesiapower.co.id/id/komunikasi-berkelanjutan/Reports/STATISTIC%20REPORT%20PT%20INDONESIA%20POWER%20TAHUN%202021.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 (PDF) https://web.archive.org/web/20221224153843/https://openjicareport.jica.go.jp/pdf/11838976_02.pdf. Archived from the original (PDF) on 24 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20230131074729/https://www.reconsult.co.id/ourexperience/detail/pltgu-muara-tawar-add-on-650-mw-block-2-3-4/. Archived from the original on 31 January 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 https://www.plnnusantarapower.co.id/penyelesaian-proyek-add-on-pltgu-muara-tawar-blok-234-650-mw-memperkuat-kelistrikan-jawa-bali/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 (PDF) https://web.archive.org/web/20240125050331/https://www.plnnusantarapower.co.id/wp-content/uploads/2023/07/AR-NP-2022_Final.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 https://web.archive.org/web/20210926024805/http://www.reconsult.co.id/ourexperience/detail/pltgu-muara-tawar-add-on-650-mw-block-2-3-4. Archived from the original on 26 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 (PDF) https://web.archive.org/web/20220119142241/https://gatrik.esdm.go.id/assets/uploads/download_index/files/3fa53-ruptl-pln-2018-2027.pdf. Archived from the original (PDF) on 19 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 (PDF) https://web.archive.org/web/20211021081234/https://web.pln.co.id/statics/uploads/2021/10/ruptl-2021-2030.pdf. Archived from the original (PDF) on 21 October 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.0 13.1 13.2 https://web.archive.org/web/20210926024805/http://www.reconsult.co.id/ourexperience/detail/pltgu-muara-tawar-add-on-650-mw-block-2-3-4. Archived from the original on 26 September 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 https://web.archive.org/web/20210310055229/https://bekasipedia.com/ratusan-buruh-geruduk-kontraktor-pt-pjb-muara-tawar-tuntut-sisa-upah/7771/. Archived from the original on 10 March 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 15.0 15.1 https://www.hutamakarya.com/karakteristik-pola-operasi-khusus-pltgu-muara-tawar-sebagai-penanggung-beban-puncak.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.