Mudejar solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Mudejar I

Mudejar solar farm (Planta solar fotovoltaica Mudejar I) is a solar photovoltaic (PV) farm under construction in Andorra, Teruel, Aragón, Spain.

Project Details

Table 1: Phase-level project details for Mudejar solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Construction[1][2] 2025 (planned)[3] 47.6 MWac[4] PV[5] Forestalia SL [100%][6][1] Energía Inagotable del Proyecto Mudéjar[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Mudejar solar farm

Phase Name Location Coordinates (WGS 84)
1 Andorra, Teruel, Aragón, Spain[6] 41.015052, -0.43289 (exact)[6]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.lacomarca.net/comienza-andorra-construccion-mudejar-i-parque-fotovoltaico-forestalia/. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240417062510/https://www.pv-magazine.es/comunicados/ges-global-energy-services-construye-3-parques-para-forestalia-en-aragon-con-una-potencia-de-123-mw/. Archived from the original on 17 April 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240206152008/https://www.power-technology.com/marketdata/power-plant-profile-mudejar-i-solar-pv-park-spain/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240417065104/https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1272881100707. Archived from the original on 17 April 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240201223430/https://www.lacomarca.net/avanza-la-planta-solar-que-samca-proyecto-en-andorra-declarada-de-interes-autonomico/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20240417061808/https://forestalia.com/fotovoltaica/. Archived from the original on 17 April 2024. {{cite web}}: Missing or empty |title= (help)