Mudejar solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Mudejar I

Mudejar solar farm (Planta solar fotovoltaica Mudejar I) is a solar photovoltaic (PV) farm under construction in Andorra, Teruel, Aragón, Spain.

Project Details

Table 1: Phase-level project details for Mudejar solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Construction[1] 2025 (planned)[2] 47.6 MWac[3] PV[4] Forestalia SL [100%][5] Energía Inagotable del Proyecto Mudéjar[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Mudejar solar farm

Phase Name Location Coordinates (WGS 84)
1 Andorra, Teruel, Aragón, Spain[6] 41.0151, -0.4329 (exact)[6]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.lacomarca.net/comienza-andorra-construccion-mudejar-i-parque-fotovoltaico-forestalia/ https://www.pv-magazine.es/comunicados/ges-global-energy-services-construye-3-parques-para-forestalia-en-aragon-con-una-potencia-de-123-mw/, https://www.lacomarca.net/comienza-andorra-construccion-mudejar-i-parque-fotovoltaico-forestalia/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240206152008/https://www.power-technology.com/marketdata/power-plant-profile-mudejar-i-solar-pv-park-spain/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 "RESOLUCIÓN de 24 de marzo de 2023, del Director General de Energía y Minas del De- partamento de Industria, Competitividad y Desarrollo Empresarial, por la que se otorga la autorización administrativa previa y de construcción de la planta fotovoltaica "CSF Mudéjar I" en el término municipal de Andorra (Teruel)". Boletín Oficial de Aragón. 2023-04-21. Archived from the original on 2024-04-17.
  4. https://web.archive.org/web/20240201223430/https://www.lacomarca.net/avanza-la-planta-solar-que-samca-proyecto-en-andorra-declarada-de-interes-autonomico/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  5. https://www.lacomarca.net/comienza-andorra-construccion-mudejar-i-parque-fotovoltaico-forestalia/ https://forestalia.com/fotovoltaica/, https://www.lacomarca.net/comienza-andorra-construccion-mudejar-i-parque-fotovoltaico-forestalia/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. 6.0 6.1 "Fotovoltaica – FORESTALIA". Forestalia. Archived from the original on 2024-04-17. Retrieved 2024-04-04.