Mulembo Lelya hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Mulembo Lelya hydroelectric plant is a hydroelectric power plant in pre-construction in Serenje District, Central Province, Zambia.

Project Details

Table 1: Project details for Mulembo Lelya hydroelectric plant

Status Nameplate capacity
Pre-construction[1] 280 MW[1]

Location

Table 2: Location details for Mulembo Lelya hydroelectric plant

Location Coordinates (WGS 84)
Serenje District, Central Province, Zambia[2] -13.8635, 30.0773 (exact)[2]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20220912113953/https://www.afrik21.africa/en/zambia-mauritius-sadc-approves-two-water-and-sanitation-projects/. Archived from the original on 12 September 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20220921212359/https://www.pietrangeli.com/mulembo-lelya-hydropower-project-zambia. Archived from the original on 21 September 2022. {{cite web}}: Missing or empty |title= (help)