Mulembo Lelya hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Mulembo Lelya hydroelectric plant is a hydroelectric power plant in pre-construction in Serenje District, Central Province, Zambia.
Project Details
Table 1: Project details for Mulembo Lelya hydroelectric plant
Status | Nameplate capacity |
---|---|
Pre-construction[1] | 280 MW[1] |
Location
Table 2: Location details for Mulembo Lelya hydroelectric plant
Location | Coordinates (WGS 84) |
---|---|
Serenje District, Central Province, Zambia[2] | -13.8635, 30.0773 (exact)[2] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20220912113953/https://www.afrik21.africa/en/zambia-mauritius-sadc-approves-two-water-and-sanitation-projects/. Archived from the original on 12 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20220921212359/https://www.pietrangeli.com/mulembo-lelya-hydropower-project-zambia. Archived from the original on 21 September 2022.
{{cite web}}
: Missing or empty|title=
(help)