Nabas wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Nabas-2 Wind Power Project (Phase 2), Nabas Wind Power Project Phase I (Phase 1), Nabas Wind Power Project Phase II (Phase 2)
Nabas wind farm is an operating wind farm in Nabas, Aklan Province, Philippines.
Project Details
Table 1: Phase-level project details for Nabas wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2015[1] | 36 MW[2] | Onshore[3] | PetroWind Energy INC [100%][4] | PetroWind Energy INC[4] |
2 | Pre-construction[3] | 2025 (planned)[5] | 14 MW[2] | Onshore[6] | PetroWind Energy INC [100%][4] | PetroWind Energy INC[4] |
Location
Table 2: Phase-level location details for Nabas wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Nabas, Aklan Province, Philippines[7] | 11.8794, 121.9859 (exact)[7] |
2 | Nabas, Aklan Province, Philippines[8] | 11.879643, 121.9858173 (exact)[8] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240126130127/https://www.philstar.com/business/2016/01/19/1544243/petrowind-energy-starts-36-mw-nabas-wind-farm. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240125192330/https://www.marketresearch.com/Heavy-Industry-c1595/Manufacturing-Construction-c86/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240125191521/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_wind_2021-03-31.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20220220024400/http://www.petroenergy.com.ph/home/news?id=news7.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20230806124457/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/02_Visayas%20Committed.pdf. Archived from the original (PDF) on 06 August 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125191802/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_wind_2021-03-31.pdf?withshield=1. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://www.google.com/maps/place/Nabas+Wind+Farm/@11.8794117121.985903415z/data=!4m5!3m4!1s0x0:0x8f0609c4d499048a!8m2!3d11.8794117!4d121.9859034.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 https://goo.gl/maps/3cDzyTTSRcNM3TDM7.
{{cite web}}
: Missing or empty|title=
(help)