Nadym-Punga Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Nadym-Punga Gas Pipeline (Russian: Газопровод Надым - Пунга) is an operating gas pipeline in Russia.[1]
Location
The pipeline starts in Nadymsky District, Yamalo-Nenets Autonomus Okrug, Russia and runs to Beryozovsky District, Khanty-Mansi Autonomous Okrug, Russia.[1]
Project details
Nadym-Punga I
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 14.5 bcm/year[2]
- Length: 575 km[2]
- Diameter: 1220 mm[3]
- Status: Operating[1][4]
- Start Year: 1972[1][2]
- Cost:
- Financing:
- Associated infrastructure:
Nadym-Punga II
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 14.5 bcm/year[2]
- Length: 572 km[2]
- Diameter: 1220 mm[3]
- Status: Operating[1][5]
- Start Year: 1973[2]
- Cost:
- Financing:
- Associated infrastructure:
Nadym-Punga III
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 31 bcm/year[2]
- Length: 566 km[2]
- Diameter: 1420 mm[1]
- Status: Operating[1][6]
- Start Year: 1975[2]
- Cost:
- Financing:
- Associated infrastructure:
Nadym-Punga IV
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 31 bcm/year[2]
- Length: 567 km[2]
- Diameter: 1420 mm[1]
- Status: Operating[1][7]
- Start Year: 1980[2]
- Cost:
- Financing:
- Associated infrastructure:
Nadym-Punga V
- Operator: Gazprom[1]
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 31 bcm/year[2]
- Length: 571 km[2]
- Diameter: 1420 mm[1]
- Status: Operating[1][6]
- Start Year: 1981[2]
- Cost:
- Financing:
- Associated infrastructure:
Background
Based on the news on flaw detection and repair processes of the parts of pipelines, these pipelines are presumed to be operating.[4][5][6][7]
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 "Газпровод Надым - Пунга I, II, IV, V". energybase.ru. Retrieved 2022-07-29.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 Вяхирев, Р (1998). Теория и опыт добычи газа (PDF). ОАО Издательство "Недра". p. 366. ISBN 5-247-03801-0.
- ↑ 3.0 3.1 "Состояние основных производственных фондов газотранспортной компании. - Асаул А.Н. и др. Модернизация экономики на основе технологических инноваций". www.aup.ru. Retrieved 2023-07-28.
- ↑ 4.0 4.1 Газпром Трансгаз Югорск (2021-02-19). "ПЕРЕГРЕБНЕНСКОЕ ЛПУМГ" (PDF). yugorsk-tr.gazprom.ru.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 "СОРУМСКОЕ ЛПУМГ" (PDF). yugorsk-tr.gazprom.ru. 2021-02-19.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 6.0 6.1 6.2 Газпром Трансгаз Югорск (2023-04-12). "НАДЫМСКОЕ ЛПУМГ" (PDF). yugorsk-tr.gazprom.ru.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 7.0 7.1 Газпром Трансгаз Югорск (2022-11-21). "КАЗЫМСКОЕ ЛПУМГ" (PDF). yugorsk-tr.gazprom.ru.
{{cite web}}
: CS1 maint: url-status (link)