Nafoora–Zueitina Oil Pipeline
From Global Energy Monitor
Part of the Global Oil Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Nafoora–Zueitina Oil Pipeline,خط أنابيب النافورة– الزويتينة is an operating oil pipeline running from Nafoora Oil field to Zueitina Oil Terminal in Al Wahat District, Libya.[1]
Location
The pipeline runs from Nafoora Oil field to Zueitina Oil Terminal in Al Wahat District, Libya.[1]
Project details
- Operator: Arabian Gulf Oil Company (AGOCO)[1]
- Owner: Libyan National Oil Corporation[1]
- Parent company: Libyan National Oil Corporation[1]
- Capacity:
- Length: 68.5 km[1]
- Diameter: 16, 24 in[1]
- Status: Operating[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Expansion projects
Replacement Pipeline
A replacement pipeline appears to have been proposed in 2021. As of April 2023 it is unclear whether construction had begun, and the project is still considered proposed.
- Operator: Arabian Gulf Oil Company (AGOCO)[1]
- Owner: Libyan National Oil Corporation[1]
- Parent company: Libyan National Oil Corporation[1]
- Capacity:
- Length: 68.5 km[2]
- Diameter: 12 in[2]
- Status: Proposed
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 OSAMA B.KH. ALI. "استبدال خط شحن الزيت "16/24" من المجمع 06 حقل النافورة إلي محطة بشركة الزويتينهA103". www.agoco.ly (in العربية). Retrieved 2023-02-10.
- ↑ 2.0 2.1 "المؤسسة الوطنية للنفط - Arabian Gulf Oil ...General Tender No. (MTC-04/2021)". noc.ly. Retrieved 2023-04-17.