Nalbant wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Nalbant wind farm is an operating wind farm in Nalbant, Tulcea County, Northern Dobruja, Romania.
Project Details
Table 1: Phase-level project details for Nalbant wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2014[2] | 14 MW[3] | Onshore[4] | Premier Energy [100%][5] | Enex SA[3] |
2 | Pre-construction[5] | 2024 (planned)[5] | 28 MW[5] | Onshore[5] | Premier Energy [100%][5] | – |
Location
Table 2: Phase-level location details for Nalbant wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Nalbant, Tulcea County, Northern Dobruja, Romania[4] | 45.0446, 28.6194 (approximate)[4] |
2 | Nalbant, Tulcea County, Northern Dobruja, Romania[4] | 45.0446, 28.6194 (approximate)[4] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240126143716/https://www.thewindpower.net/windfarm_en_24314_nalbant.php. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240218234131/https://alivecapital.ro/en/producere-energie-electrica/cee-nalbant/. Archived from the original on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20171017233419/http://www.anre.ro:80/download.php?f=gqqAhw==&t=vdeyut7dlcecrLbbvbY=. Archived from the original on 17 October 2017.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240126111634/https://www.thewindpower.net/windfarm_en_24314.php. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20240218234139/https://www.energynomics.ro/en/iuliana-panescu-premier-energy-invests-in-the-next-period-around-150-million-euro-in-green-projects/. Archived from the original on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help)