Neckeherdim-Paur hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Neckeherdim-Paur hydroelectric plant is a cancelled hydroelectric power plant in Mastuj Tehsil, Upper Chitral District, Malakand Division, Khyber Pakhtunkhwa, Pakistan.

Project Details

Table 1: Project details for Neckeherdim-Paur hydroelectric plant

Status Nameplate capacity Technology type Owner
Cancelled[1] 80 MW[2] Run-of-river[3] Private Power and Infrastructure Board[3]

Location

Table 2: Location details for Neckeherdim-Paur hydroelectric plant

Location River Coordinates (WGS 84)
Mastuj Tehsil, Upper Chitral District, Malakand Division, Khyber Pakhtunkhwa, Pakistan[2] Yarkun River[2] 36.3318, 72.2872 (approximate)[2]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 4 years no published updates, https://www.hydroreview.com/world-regions/asiaoceania/pakistani-board-reports-on-hydropower-project-progress/
  2. 2.0 2.1 2.2 2.3 https://webcache.googleusercontent.com/search?q=cache:ZtaR-rvt1LwJ:https://www.mofa.go.kr/www/brd/m_4052/down.do%3Fbrd_id%3D14456%26seq%3D351670%26data_tp%3DA%26file_seq%3D1&cd=3&hl=zh-TW&ct=clnk&gl=tw. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.power-technology.com/marketdata/neckeherdim-paur-pakistan/. {{cite web}}: Missing or empty |title= (help)