Nereidas Valley geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Nereidas Valley geothermal power plant (Central geotérmica Valle de Nereidas) is a geothermal power plant in pre-construction in Neridas Valley, Caldas Department, Colombia.
Project Details
Table 1: Unit-level project details for Nereidas Valley geothermal power plant
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Pre-construction[1] | 30 MW[2] | Unknown type | Baker Hughers [33%]; Ecopetrol SA [33%]; Central Hidroeléctrica de Caldas (CHEC) [33%][1][1][1] |
Location
Table 2: Unit-level location details for Nereidas Valley geothermal power plant
Location | Coordinates (WGS 84) |
---|---|
Neridas Valley, Caldas Department, Colombia | 5.0438, -75.5246 (approximate) |
The map below shows the approximate location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://www.thinkgeoenergy.com/ecopetrol-baker-hughes-chec-partner-up-for-nereidas-valley-geothermal-project-colombia/?utm_source=ThinkGeoEnergy+List&utm_campaign=dedcfb3b16-TGE_Newsletter_RSS1&utm_medium=email&utm_term=0_657e42f767-dedcfb3b16-415278945.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240319061117/https://www.thinkgeoenergy.com/ecopetrol-to-proceed-with-drilling-for-caldas-geothermal-project-colombia/. Archived from the original on 19 March 2024.
{{cite web}}
: Missing or empty|title=
(help)