Neret solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Neret solar farm (Planta solar fotovoltaica Neret) is a solar photovoltaic (PV) farm in pre-construction in Tremp, El Pallars Jussà, Lleida, Cataluña, Spain.

Project Details

Table 1: Phase-level project details for Neret solar farm

Status Nameplate capacity Technology Owner
Pre-construction[1] 35 MWp/dc[1] PV[2] Energies Renovables Terra Ferma SL [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Neret solar farm

Location Coordinates (WGS 84)
Tremp, El Pallars Jussà, Lleida, Cataluña, Spain[2] 42.1452, 0.9498 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://govclipping.com/es/catalunya/boa/2023-10-24/10272-departamento-accion-climatica-alimentacion-agenda-rural-anuncios-dogc-n-2023-9026, https://dtes.gencat.cat/portalAA/AppJava/document.do?codi=f590d5c507554e64b3f79075b87526bd https://mediambient.gencat.cat/web/.content/home/ambits_dactuacio/avaluacio_ambiental/energies_renovables/documents/ParcsEolics_ParcsSolars_Web.xlsx, https://govclipping.com/es/catalunya/boa/2023-10-24/10272-departamento-accion-climatica-alimentacion-agenda-rural-anuncios-dogc-n-2023-9026, https://dtes.gencat.cat/portalAA/AppJava/document.do?codi=f590d5c507554e64b3f79075b87526bd. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 "RESOLUCIÓN ACC/3549/2023, de 20 de julio, por la que se otorga a Energies Renovables Terra Ferma, SL, la autorización administrativa previa y se eleva al Consejo Ejecutivo el otorgamiento de la autorización de construcción del proyecto de la planta solar fotovoltaica denominada PS Neret, de 35 MW". Departamento de Acción Climática, Alimentación y Agenda Rural. 2023-10-24. Archived from the original on 2024-02-19. Retrieved 2024-02-09.