New England Wind

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Vineyard Wind South, Park City Wind (Phase 1), OCS-A 0534 (Phase 1), Commonwealth Wind (Phase 2), OCS-A 0561 (Phase 2)

New England Wind is a wind farm in pre-construction in Edgartown, Dukes County, Massachusetts, United States.

Project Details

Table 1: Phase-level project details for New England Wind

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Pre-construction[1] 2027 (planned)[1] 800 MW[2] Offshore hard mount[3] Avangrid Renewables [50%]; Copenhagen Infrastructure Partners P/S [50%][4] Copenhagen Infrastructure Partners; Avangrid Renewables[5]
2 Pre-construction[6] 2027 (planned)[7] 1350 MW[3] Offshore hard mount[3] Avangrid Renewables [50%]; Copenhagen Infrastructure Partners P/S [50%][4] Avangrid Renewables[8]

Location

Table 2: Phase-level location details for New England Wind

Phase Name Location Coordinates (WGS 84)
1 Edgartown, Dukes County, Massachusetts, United States[9] 41.0471, -70.4874 (approximate)[9]
2 West Tisbury, Massachusetts, United States[6] 40.9357, -70.7601 (approximate)[6]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "New England Wind 1". offshorewindpowerhub.org. 2027-01-12. Archived from the original on 2024-10-04. Retrieved 2024-08-26. {{cite web}}: Check date values in: |date= (help); Text "Offshore wind" ignored (help)
  2. "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  3. 3.0 3.1 3.2 (PDF) https://web.archive.org/web/20240125181150/https://www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://www.vineyardwind.com/partners https://www.vineyardwind.com/partners, https://www.vineyardwind.com/partners. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. (PDF) https://www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf https://www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf, https://www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 "New England Wind 2". offshorewindpowerhub.org. 2027-01-18. Archived from the original on 2024-10-04. Retrieved 2024-08-26. {{cite web}}: Check date values in: |date= (help); Text "Offshore wind" ignored (help)
  7. (PDF) https://web.archive.org/web/20240125174432/https://www.energy.gov/sites/default/files/2023-08/offshore-wind-market-report-2023-edition-summary_0.pdf. Archived from the original (PDF) on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  8. https://www.commonwealthwind.com/benefits. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)