New England Wind

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Vineyard Wind South, Commonwealth Wind (Phase 2), OCS-A 0534, Park City Wind (Phase 1)

New England Wind is a wind farm in pre-construction in Edgartown, Dukes County, Massachusetts, United States.

Project Details

Table 1: Phase-level project details for New England Wind

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Pre-construction[1] 2027 (planned)[2] 804 MW[1] Offshore hard mount[1] Copenhagen Infrastructure Partners [50%]; Avangrid Renewables [50%][3][3] Avangrid Renewables; Copenhagen Infrastructure Partners[1][1]
2 Pre-construction[1] 2027 (planned)[2] 1350 MW[1] Offshore hard mount[1] Copenhagen Infrastructure Partners [50%]; Avangrid Renewables [50%][3][3] Avangrid Renewables[4]

Location

Table 2: Phase-level location details for New England Wind

Phase Name Location Coordinates (WGS 84)
1 Edgartown, Dukes County, Massachusetts, United States[5] 41.0471, -70.4874 (approximate)[5]
2 West Tisbury, Massachusetts, United States[6] 40.9357, -70.7601 (approximate)[6]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://web.archive.org/web/20240125181150/https://www.boem.gov/sites/default/files/documents/renewable-energy/VW-South-COP-Volume-I.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20240125174432/https://www.energy.gov/sites/default/files/2023-08/offshore-wind-market-report-2023-edition-summary_0.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240131101230/https://www.vineyardwind.com/partners. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. https://www.commonwealthwind.com/benefits. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 (PDF) https://web.archive.org/web/20240131182401/https://www.boem.gov/sites/default/files/documents/renewable-energy/state-activities/Lease-501-534-Visual.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)