New River Valley Solar Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Pulaski Solar Farm, Nrv Commerce Park
New River Valley Solar Project is a solar photovoltaic (PV) farm in pre-construction in Pulaski County, Virginia, United States.
Project Details
Table 1: Phase-level project details for New River Valley Solar Project
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Pre-construction[1] | 2024 (planned)[2] | 150 MWac[1] | PV[1] | Hecate Energy; AgriSunPower LLC (ASP)[3][3] | Hecate Energy[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for New River Valley Solar Project
Location | Coordinates (WGS 84) |
---|---|
Pulaski County, Virginia, United States[4] | 37.0581, -80.7297 (approximate)[4] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20210601212127/http://www.hecateenergy.com/projects/. Archived from the original on 01 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240206202317/https://roanoke.com/news/local/southwest-virginias-largest-solar-farm-project-approved-in-pulaski-county/article_e787eeca-5f4e-11eb-bdc6-f72f79c490c3.html. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 https://web.archive.org/web/20240206180606/https://pcpatriot.com/hecate-energy-amends-special-use-permit-for-pulaski-county-solar-facility/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)