New River Valley Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Pulaski Solar Farm, Nrv Commerce Park

New River Valley Solar Project is a solar photovoltaic (PV) farm in pre-construction in Pulaski County, Virginia, United States.

Project Details

Table 1: Phase-level project details for New River Valley Solar Project

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1] 2024 (planned)[2] 150 MWac[1] PV[1] Hecate Energy; AgriSunPower LLC (ASP)[3][3] Hecate Energy[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for New River Valley Solar Project

Location Coordinates (WGS 84)
Pulaski County, Virginia, United States[4] 37.0581, -80.7297 (approximate)[4]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20210601212127/http://www.hecateenergy.com/projects/. Archived from the original on 01 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240206202317/https://roanoke.com/news/local/southwest-virginias-largest-solar-farm-project-approved-in-pulaski-county/article_e787eeca-5f4e-11eb-bdc6-f72f79c490c3.html. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240206180606/https://pcpatriot.com/hecate-energy-amends-special-use-permit-for-pulaski-county-solar-facility/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)