New River Valley Solar Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Pulaski Solar Farm, Nrv Commerce Park
New River Valley Solar Project is a solar photovoltaic (PV) farm in pre-construction in Pulaski County, Virginia, United States.
Project Details
Table 1: Phase-level project details for New River Valley Solar Project
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Pre-construction[1] | 150 MWac[1] | PV[2] | Hecate Energy; AgriSunPower LLC (ASP)[3] | Hecate Energy[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for New River Valley Solar Project
Location | Coordinates (WGS 84) |
---|---|
Pulaski County, Virginia, United States[1] | 37.0581, -80.7297 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ https://web.archive.org/web/20210601212127/http://www.hecateenergy.com/projects/. Archived from the original on 01 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://roanoke.com/news/local/southwest-virginias-largest-solar-farm-project-approved-in-pulaski-county/article_e787eeca-5f4e-11eb-bdc6-f72f79c490c3.html https://roanoke.com/news/local/southwest-virginias-largest-solar-farm-project-approved-in-pulaski-county/article_e787eeca-5f4e-11eb-bdc6-f72f79c490c3.html, https://roanoke.com/news/local/southwest-virginias-largest-solar-farm-project-approved-in-pulaski-county/article_e787eeca-5f4e-11eb-bdc6-f72f79c490c3.html.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240206180606/https://pcpatriot.com/hecate-energy-amends-special-use-permit-for-pulaski-county-solar-facility/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)