Ninh Thuận 2 offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Ninh Thuận 2 offshore wind farm is an announced wind farm in Thuận Nam, Ninh Thuận Province, Vietnam.

Project Details

Table 1: Phase-level project details for Ninh Thuận 2 offshore wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner
1 Announced[1] 2030 (planned)[1] 1000 MW[1] Offshore mount unknown[1] T&T Group JSC; Ørsted A/S (Tập đoàn T&T Group)[1][1]
2 Announced[1] 2037 (planned)[1] 1000 MW[1] Offshore mount unknown[1] T&T Group JSC; Ørsted A/S (Tập đoàn T&T Group)[1][1]

Location

Table 2: Phase-level location details for Ninh Thuận 2 offshore wind farm

Phase Name Location Coordinates (WGS 84)
1 Thuận Nam, Ninh Thuận Province, Vietnam[1] 10.799263, 108.081436 (approximate)[1]
2 Thuận Nam, Ninh Thuận Province, Vietnam[1] 10.799263, 108.081436 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 https://web.archive.org/web/20240125203029/https://baodautu.vn/tap-doan-orsted-chuan-bi-dau-tu-2-du-an-dien-gio-tai-huyen-thuan-nam-d170764.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)