Nizhneboguchanskaya hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Nizhneboguchanskaya hydroelectric plant (Нижнебогучанская ГЭС) is a hydroelectric power plant in pre-construction in Boguchany, Boguchansky District, Krasnoyarsk Krai, Russia.
Project Details
Table 1: Project details for Nizhneboguchanskaya hydroelectric plant
Status | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|
Pre-construction[1] | 660 MW[2] | 10[2] | Conventional storage[2] | United Company RUSAL PLC (ОАО «РУСАЛ»)[3] |
Location
Table 2: Location details for Nizhneboguchanskaya hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Boguchany, Boguchansky District, Krasnoyarsk Krai, Russia[2] | Angara River[2] | 58.3828, 97.4616 (approximate)[2] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20230323140017/https://obzor.city/news/665351---en-rasschitvaet-na-federalnuju-podderzhku-stroitelstva-ges-na-tomi. Archived from the original on 23 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20220922092024/https://dela.ru/news/271651/. Archived from the original on 22 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221003184204/https://companies.rbc.ru/id/1062420008188-ooo-nizhneboguchanskaya-ges/. Archived from the original on 03 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)