Noble Clinton wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Clinton (Phase 1)

Noble Clinton wind farm is an operating wind farm in Clinton County, New York, United States.

Project Details

Table 1: Phase-level project details for Noble Clinton wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2008[1] 100 MW[2] Onshore[2] AES Corp [100%][3][4][5] AES[4]
RP Pre-construction[6] 2025 (planned)[6] 108 MW[7] Onshore[2] AES Corp [100%][6]

Location

Table 2: Phase-level location details for Noble Clinton wind farm

Phase Name Location Coordinates (WGS 84)
1 Clinton County, New York, United States[2] 44.938, -73.9902 (exact)[2]
RP United States[2] 44.938, -73.9902 (exact)[2]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://doi.org/10.5066/F7TX3DN0. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240131101338/https://www.tdworld.com/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240131022126/https://renews.biz/74194/aes-buys-612mw-new-york-wind-portfolio/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240131101229/https://www.carlyle.com/media-room/news-release-archive/carlyle-group-acquire-wind-generation-portfolio-noble-environmental. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20240126123524/https://www.aes.com/new-york/project/clinton-wind. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. (PDF) https://web.archive.org/web/20240125181135/https://www.aes.com/sites/default/files/2022-12/2022.12.06%20Clinton-Ellenburg%20Community%20Meeting%20Boards%20FINAL_0.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)