Nooros–Abu Madi–El Gamil Gas Pipline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Nooros–Abu Madi–El Gamil Gas Pipline, خط أنابيب "نورس – أبو ماضي- الجميل", is an operating gas pipeline in Egypt.[1][2]
Location
Project details
- Operator:
- Owner: Egyptian Natural Gas Holding Company
- Parent company: Egyptian Natural Gas Holding Company
- Capacity: 1.1 MMSCMD
- Length: 126 km[1]
- Diameter: 24, 32 in[2]
- Status: Operating
- Start year: 2019
- Cost: USD 300 million
- Financing:
- Associated infrastructure:
Background
Construction began in 2017, and the pipeline was completed in 2019.
Articles and resources
References
- ↑ 1.0 1.1 "الملا يتابع الموقف التنفيذي لمشروع إنشاء خط أنابيب نورس – أبو ماضي – الجميل - بوابة الأهرام". بوابة الأهرام (in العربية). Retrieved 2022-09-15.
- ↑ 2.0 2.1 "https://petrojeteg.com/?project=2207". Retrieved 2022-09-15.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|title=