Nooros–Abu Madi–El Gamil Gas Pipline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Nooros–Abu Madi–El Gamil Gas Pipline, خط أنابيب "نورس – أبو ماضي- الجميل", is an operating gas pipeline in Egypt.[1][2]

Location

Loading map...

Project details

  • Operator:
  • Owner: Egyptian Natural Gas Holding Company
  • Parent company: Egyptian Natural Gas Holding Company
  • Capacity: 1.1 MMSCMD
  • Length: 126 km[1]
  • Diameter: 24, 32 in[2]
  • Status: Operating
  • Start year: 2019
  • Cost: USD 300 million
  • Financing:
  • Associated infrastructure:

Background

Construction began in 2017, and the pipeline was completed in 2019.

Articles and resources

References

  1. 1.0 1.1 "الملا يتابع الموقف التنفيذي لمشروع إنشاء خط أنابيب نورس – أبو ماضي – الجميل - بوابة الأهرام". بوابة الأهرام (in العربية). Retrieved 2022-09-15.
  2. 2.0 2.1 "https://petrojeteg.com/?project=2207". Retrieved 2022-09-15. {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)