The North East Data LLC Niagara facility is a 50 MW cryptocurrency mining operation located in Niagara Falls, New York, USA. It is a joint venture between Blockfusion and North East Data LLC.

Location

The map below shows the exact location of the North East Data LLC Niagara facility in Niagara Falls, New York, USA.

Loading map...

Background

The facility is housed at the location of a former coal fired power plant, which was modified to burn biomass and tire-derived material in 2007.[1] The plant was mothballed in 2013.[2] According to Blockfusion, the company is vertically integrated and owns the former power plant and the land on which it is located.[3] In May of 2022, an explosion at the substation that provides power to the facility resulted in the temporary shutdown of thousands of mining rigs, prompting Blockfusion to demand compensation for the down time.[4]

Project Details

  • Power usage (MW): 50
  • Owner: North East Data LLC
  • Parent: Blockfusion
  • Location:
  • Coordinates: 43.0828642, -79.0034955

Articles and Resources

References

  1. "Niagara Generation LLC". Retrieved 7/13/2022. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "Niagara Generation to mothball New York plant as of May 9". Transmission Hub. 2/15/2013. Retrieved 7/13/2022. {{cite news}}: Check date values in: |access-date= and |date= (help)
  3. "Best-in-class blockchain infrastructure". Blockfusion. Retrieved 7/13/2022. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. "Thousands of Bit Digital miners go offline after explosion, fire at NY facility". Cryptonews.com. 5/20/2022. Retrieved 7/13/2022. {{cite news}}: Check date values in: |access-date= and |date= (help)