North Malay Basin (NMB) Integrated Oil and Gas Development Project (Malaysia)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

North Malay Basin (NMB) Integrated Oil and Gas Development Project is an operating oil and gas project in Malaysia.


The project consists of the following units:

  • Bergading Oil and Gas Field (Malaysia)
  • Bunga Dahlia Oil and Gas Field (Malaysia)
  • Teratai Oil and Gas Field (Malaysia)
  • Gajah Oil and Gas Field (Malaysia)
  • Melati Oil and Gas Field (Malaysia)
  • Kamelia Oil and Gas Field (Malaysia)
  • Zetung Oil and Gas Field (Malaysia)
  • Anggerik Oil and Gas Field (Malaysia)
  • Kesumba Oil and Gas Field (Malaysia)

Project Details

Main Data

Table 1: Project-level project details for North Malay Basin (NMB) Integrated Oil and Gas Development Project

1Final Investment Decision
2If a country or region is known to not produce any hydrocarbons in an unconventional method, this production type is assumed to be conventional
Unit name Status Operator Owner Discovery year FID1 year Production start year Production type2
North Malay Basin (NMB) Integrated Gas Development Operating[1][2][3] Hess Malaysia[1] Hess Malaysia (50.0%); Petronas Carigali (50.0%)[1] 2021[4] 2013[5] Conventional

Production and Reserves

Table 2: Reserves of North Malay Basin (NMB) Integrated Oil and Gas Development Project

million m³ = million cubic meters
million bbl = million barrels of oil
Fuel description Reserves classification Quantity Units Data year Source
condensate gross recoverable resources 20 million bbl 2020 [1]
gas gross recoverable resources 42474.87 million m³ 2020 [1]
gas Remaining reserves 40832.51 million m³ 2021 [4]

Table 3: Production from North Malay Basin (NMB) Integrated Oil and Gas Development Project

million m³/y = million cubic meters per year
Category Fuel description Quantity Units Data year Source
production gas 1705.37 million m³/y 2017 [5]
production gas 2924.96 million m³/y 2022 [2]

Location

Table 4: Project-level location details for North Malay Basin (NMB) Integrated Oil and Gas Development Project

Concession/Block Location Onshore/Offshore Coordinates (WGS 84)
PM302, PM325 and PM326B[5] Offshore, Malaysia[6] Offshore[3] 6.9813, 103.6441 (approximate)[6]

The map below shows the approximate location of the project:

Loading map...

Articles and Resources

Additional Data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20210626051814/https://www.ogj.com/drilling-production/production-operations/field-start-ups/article/14167345/hess-reports-first-gas-from-north-malay-basin-phase-ii. Archived from the original on 26 June 2021. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 GlobalData (45197). "Natural gas in Malaysia". Offshore Technology. Archived from the original on June 3, 2024. Retrieved June 3, 2024. {{cite web}}: Check date values in: |date= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240606155847/https://www.oedigital.com/news/499701-hess-starts-gas-production-from-nmb-phase-3-project-offshore-malaysia. Archived from the original on 06 June 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 Nick Ferris (44404). "Exclusive natural gas data reveals trillions of dollars of upcoming projects". Energy Monitor. Archived from the original on 44974. Retrieved 44974. {{cite web}}: Check date values in: |access-date=, |date=, and |archive-date= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20230320183223/https://www.offshore-technology.com/projects/north-malay-basin-integrated-gas-development-project/. Archived from the original on 20 March 2023. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 (PDF) https://web.archive.org/web/20240605235454/https://s3.amazonaws.com/aramis-craft-medias/case_studies/pdf/54-Hess-North-Malay-Basin-EPS-Malaysia-Scoping-Fast-Tracking-Study.pdf. Archived from the original (PDF) on 05 June 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)