North Rumela-Al-Najaf Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

North Rumela-Al-Najaf Gas Pipeline,انبوب غاز شمال الرميلة- النجف, is an under construction gas pipeline in Iraq.[1]

Location

The pipeline is proposed to run from the northern Rumela oil fields in Basrah to Al-Najaf governorate in Iraq. [1]

Loading map...

Project details

  • Operator: Basrah Gas Company [1][2]
  • Owner: South Gas Company (51%), Shell (44%), and Mitsubishi Corporation (5%).[2]
  • Parent company: Iraqi Ministry of Oil
  • Capacity:
  • Length: 350 kilometers
  • Diameter:
  • Status: Construction[1]
  • Start year: 2019
  • Cost:
  • Financing:
  • Associated infrastructure:

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "أنبوب غاز جديد لدعم قطاعي الطاقة والصناعة في مدن عراقية". اندبندنت عربية (in العربية). 2021-01-19. Retrieved 2022-07-26.
  2. 2.0 2.1 "Basrah Gas Company". www.shell.iq. Retrieved 2022-07-26.

*add as many countries as the pipeline passes through