Novo-Salavat power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Novo-Salavat power station (Ново-Салаватская ТЭЦ, ООО «НСТЭЦ», Ново-Салаватская ПГУ (Unit CC1), Ново-Салаватская ТЭЦ, ООО «НСТЭЦ») is an operating power station of at least 807-megawatts (MW) in Salavat, Republic of Bashkortostan, Russia with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Novo-Salavat power station | Salavat, Republic of Bashkortostan, Russia | 53.424253, 55.881143 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1, 1R, 2, 5R, 6, 7, CC1: 53.424253, 55.881143
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
1 | Retired[2][3][4] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5][6][7] | 50[8][9][10] | steam turbine[8] | yes[6] | 1966[10] | 2022[5][3][2][4] |
1R | Construction[2][3][11] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5][6][7] | 50[12][3][13] | steam turbine[4] | yes[4] | 2024 (planned)[5][14][15][2][3][13] | – |
2 | Retired[8][10] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5][6][7] | 50[8][9][10] | steam turbine[8] | yes[6] | 1966[10] | 2021[16] |
5R | Operating[2][3][11] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5][6][7] | 105[12][3] | steam turbine[4] | yes[4] | 2022[2][3][11][4] | – |
6 | Operating[10] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5][6][7] | 135[8][9] | steam turbine[8] | yes[6] | 1975[10] | – |
7 | Operating[4][10] | fossil gas: natural gas, fossil liquids: heavy fuel oil[5][6][7] | 135[8][9] | steam turbine[8] | yes[6] | 1981[10] | – |
CC1 | Operating[4][10] | fossil gas: natural gas[5][6][7] | 432[5][17] | combined cycle[17][8] | yes[10] | 2016[10] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Novo-Salavatskaya CHP LLC [100%][18][3][10] | Gazprom PJSC [100.0%] |
1R | Novo-Salavatskaya CHP LLC [100%][18][3][10] | Gazprom PJSC [100.0%] |
2 | Novo-Salavatskaya CHP LLC [100%][18][3][10] | Gazprom PJSC [100.0%] |
5R | Novo-Salavatskaya CHP LLC [100%][18][3][10] | Gazprom PJSC [100.0%] |
6 | Novo-Salavatskaya CHP LLC [100%][18][3][10] | Gazprom PJSC [100.0%] |
7 | Novo-Salavatskaya CHP LLC [100%][18][3][10] | Gazprom PJSC [100.0%] |
CC1 | Novo-Salavatskaya CHP LLC [100%][18][3][10] | Gazprom PJSC [100.0%] |
Project-level captive use details
Background
Unit 1R
The turbine for unit 1 was proposed to be replaced, as shown in the Russia's Ministry of Energy (Minenergo) 2021-2027[21] and 2022-2028 energy program. The latter program was released in February 2022.[22][23] This was also announced by the company in November 2019.[24] Unit 1 was originally expected to retire in 2022[21] The expected start up date of the new unit 1R is 2023.[24] , but this date has been updated to 2024.[23][25] As of December 2022, the design work has been completed, and the documentation for the installation has been prepared. The main equipment, including the turbine and generator, has been supplied, with some elements already mounted.[26] According to the Russia's Ministry of Energy 2024-2029 energy program, released in November 2024, the unit is still planned to be commissioned in 2024.[27] As of May 2024, there have not been any updates about the project.
Unit 5R
The turbine for unit 5 was proposed to be replaced, as shown in the Russia's Ministry of Energy (Minenergo) 2021-2027[21] and 2022-2028 energy program. The latter program was released in February 2022.[22] This was also announced by the company in November 2019.[24] The expected start up date of the new unit 5R is 2022. In November 2019, unit 5 was being dismantled.[24] In July 2022, construction of the new unit 5R was underway: a rotor for the turbo-generator, which is the main part of the steam turbine, was mounted for this unit.[28]
Unit 7 (generator replacement)
The turbo-generator for the turbine at unit 7 is proposed to be replaced, according to a media article from November 2019[24] and company newsletter.[29] The expected start up date of the new turbo-generator is 2024.[24] In December 2022, it was reported that development of project documentation was underway, and orders for manufacturing of the generator and the steam turbine had been placed. The generator had been manufactured by the Power Machines plant in St. Petersburg and was undergoing factory testing. The generator was expected to be shipped to the Novo-Salavat power station in early 2023.[26] As of November 2023. there have not been any updates about the project. The Russia's Ministry of Energy 2023-2028 and 2024-2029 energy programs do not mention the project.[22][23][27]
Unit 3 (renovation)
There are also reports about plans for replacement of a generator at unit 3 (40 MW)[21], with a contract for equipment delivery signed in 2019.[24][28]
Articles and Resources
References
- ↑ https://www.google.com/maps/place/%D0%9E%D0%9E%D0%9E+%22%D0%9D%D0%BE%D0%B2%D0%BE-%D0%A1%D0%B0%D0%BB%D0%B0%D0%B2%D0%B0%D1%82%D1%81%D0%BA%D0%B0%D1%8F+%D0%A2%D0%AD%D0%A6%22/@53.4233164,55.8803589,792m/data=!3m1!1e3!4m5!3m4!1s0x43d800948bb82443:0x9453bc4eb57032ee!8m2!3d53.421847!4d55.8814429?hl=ru.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 https://web.archive.org/web/20210908202213/https://minenergo.gov.ru/system/download-pdf/20706/156298. Archived from the original on 08 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 (PDF) https://web.archive.org/web/20220928070741/https://salavat-neftekhim.gazprom.ru/d/journal/f9/249/19-11-02.pdf. Archived from the original (PDF) on 28 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 (PDF) https://web.archive.org/web/20230313034358/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/43_Respublika_Bashkortostan_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 https://energybase.ru/power-plant/Novo_Salavatskaya_CHP.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 https://web.archive.org/web/20210909164314/https://salavat.bezformata.com/listnews/visokaya-energiya/75466/. Archived from the original on 09 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 8.7 8.8 8.9 https://web.archive.org/web/20220303100136/https://ru.wikipedia.org/wiki/%D0%9D%D0%BE%D0%B2%D0%BE-%D0%A1%D0%B0%D0%BB%D0%B0%D0%B2%D0%B0%D1%82%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 03 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 9.0 9.1 9.2 9.3 https://web.archive.org/web/20111031142219/http://www.nslvtec.ru/index.php/2009-12-15-09-47-35.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 10.16 10.17 10.18 https://web.archive.org/web/20211129124332/https://www.nslvtec.ru/istoriya/. Archived from the original on 29 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 (PDF) https://web.archive.org/web/20221225151103/https://salavat-neftekhim.gazprom.ru/d/journal/9b/411/22-12-17.pdf. Archived from the original (PDF) on 25 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 https://web.archive.org/web/20220708172949/http://www.energyland.info/analitic-show-193095. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 13.0 13.1 https://web.archive.org/web/20230727121055/https://www.so-ups.ru/odu-ural/news/odu-ural-news-view/news/21549/. Archived from the original on 27 July 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240112192433/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/44_Respublika_Bashkortostan.pdf. Archived from the original (PDF) on 12 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240120035218/https://www.bigpowernews.ru/photos/0/0_hwMWLFCE8gF4WY3kGoos5DkyfTCuFMXM.pdf. Archived from the original (PDF) on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20230403230253/https://www.so-ups.ru/fileadmin/files/company/reports/disclosure/2022/ups_rep2021.pdf. Archived from the original (PDF) on 03 April 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 17.0 17.1 https://web.archive.org/web/20160330092703/http://www.trestszem.ru/salavat.html.
{{cite web}}
: Check|archive-url=
value (help); Missing or empty|title=
(help) - ↑ 18.0 18.1 18.2 18.3 18.4 18.5 18.6 https://web.archive.org/web/20221225151428/https://nslvtec.ru/. Archived from the original on 25 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 https://elsib.ru/ru/jelsib-otgruzil-osnovnye-uzly-turbogeneratora-dlja-novo-salavatskoj-tjec/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 20.0 20.1 https://web.archive.org/web/20220817190607/https://salavat-neftekhim.gazprom.ru/press/news/2022/07/221/. Archived from the original on 17 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 21.0 21.1 21.2 21.3 "Схема и программа развития Единой энергетической системы России на 2021 – 2027 годы". Ministry of Energy of the Russian Federation. Feb 26, 2021. Archived from the original on Sep 8, 2021. Retrieved May 5, 2022.
- ↑ 22.0 22.1 22.2 "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"". Garant.ru. Feb 28, 2022. Retrieved Oct 31, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 23.0 23.1 23.2 "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ РЕСПУБЛИКА БАШКОРТОСТАН" (PDF). SO UPS of Russia. February 28, 2023. Retrieved November 30, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 24.0 24.1 24.2 24.3 24.4 24.5 24.6 "Ново-Салаватская ТЭЦ обновит 290 мегаватт генерирующих мощностей". Energyland.info. Nov 8, 2019. Retrieved Apr 21, 2022.
- ↑ "Новые объекты электроэнергетики Башкирии обеспечат устойчивое развитие региона". SO UPS of Russia. April 25, 2023. Retrieved November 30, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 26.0 26.1 "ЗАВЕРШЕН ПЕРВЫЙ ЭТАП МОДЕРНИЗАЦИИ" (PDF). Салаватский нефтехимик. December 17, 2022. Retrieved November 30, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 27.0 27.1 "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА РЕСПУБЛИКИ БАШКОРТОСТАН" (PDF). SO UPS of Russia. November 30, 2023. Retrieved May 6, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 28.0 28.1 "На Ново-Салаватской ТЭЦ идет реновация". salavat-neftekhim.gazrom.ru. Jul 21, 2022. Retrieved Oct 31, 2022.
- ↑ "ПРИСТУПИЛИ К РЕНОВАЦИИ" (PDF). Salavatskiy Neftekhimik. 39: 3. Nov 2, 2019.
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.