Novosokolniki-Pustoshka Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Novosokolniki-Pustoshka Gas Pipeline (Russian: Газопровод-отвод ГРС Новосокольники - ГРС «Пустошка» Псковской области) is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to run from Novosokolniki, Pskov Oblast to Pustoshka, Pskov Oblast, Russia.
Project details
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity:
- Length:
- Diameter:
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: Pustoshka-Idritsa Gas Pipeline, Valdai-Pskov-Riga Gas Pipeline
Background
The pipeline was included in the gasification program of Gazprom for 2021-2025 for the Pskov Oblast.[1] It is a branch pipeline from the Valdai-Pskov-Riga Gas Pipeline.[2] The construction is expected to begin in 2025-2027.[3]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "Программа газификации 2021–2025 в Псковской области". Gazprommap.ru. 2022. Retrieved Jul 28, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "О внесении изменения в Схему территориального планирования Псковской области". October 27, 2020. Retrieved July 31, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "АДМИНИСТРАЦИЯ ПСКОВСКОЙ ОБЛАСТИ ПОСТАНОВЛЕНИЕ от от 24.03.2022 № 90". Администрация Псковской области. March 24, 2022. Retrieved 2022-08-09.
{{cite web}}
: line feed character in|title=
at position 32 (help)CS1 maint: url-status (link)