Novovolynskaya No 10 Coal Miine (Шахта Нововолынская № 10) is a proposed coal mine in Novovolynsk, Volyn, Ukraine.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Novovolynskaya No 10 Coal Miine Novovolynsk, Volyn, Ukraine 50.7460150034007, 24.0582368854128 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Project Type Opening Year Closing Year
Proposed Construction[1] New

Table 3: Operation details

Note: The asterisk (*) signifies that the value is a GEM estimated figure.
Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
0.9[2] Underground 730* *

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
40 2024 Bituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
State Property Fund of Ukraine [1] State Property Fund of Ukraine [100%] Ukraine

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.

Background

Novovolynskaya No 10 Coal Mine is an underground coal mine in Volyn Oblast, Ukraine. The mine's construction began already in 1989 with planned capacity of 0.9 Mtpa. As of 2021, it was regarded as 87% complete. Reserves would be sufficient for 20 years of operations. The mine has been planned for privatization since 2018.[2][3]

It is the only mine that has been built in independent Ukraine. Construction has been suspended since 2018 when the government began to allocate funds only for maintaining the complex in an accident-free condition.

At the end of 2022, the state-owned enterprise "Directorate for the construction of objects" announced a tender for the development of a technical and economic justification of the "inexpediency" of the completion of the mine. State-owned "Ukrndiproekt"" was awarded the contract. However it seemed that the work under this contract has not been completed as in August 2023 the contract was terminated. Another contract was awarded in September 2023 to "Naftogazmontazh".[4] One of the concerns has been the low quality of coal in Volyn, which needs to be enriched.

As of October 2023, 105 workers maintained the mine in normal condition and 29 miners were working underground.[4]

In January 2024, there were rumours of imminent privatization of the mine. The branch of the State Property Fund, which deals directly with issues of mine privatization, announced the purchase of services for the production of technical passports for the assets of the mine. The current workers and managers of the mine were concerned about the unexpected consequences of privatization, such as failure to properly maintain and actually commission the facility. A lot of funds was spent to develop the mine - 1.7 billion hryvnias (about USD 45 million). According to the miners, 900,000 tonnes of coal could be mined in a year's time.[5]

As of October 2024, the mine was asking for 300 million hryvnias from the state to finalize construction and start operations. "The project has been developed, and regulatory and legal frameworks are in place to start operations. The funds were required for equipment repairs, miners' salaries, electricity, and pit preparation. Coal production at Mine No. 10 "Novovolynska" could begin with 7 months from the start of financing. Three months after the start of coal mining operations, monthly production could be 10,000-14,000 tonnes of coal.[6]

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240129173301/https://konkurent.ua/publication/131100/shahtu-10-novovolinska-hochut-privatizuvati-yaki-mozhut-buti-naslidki-video/. Archived from the original on 29 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 ""Волынь - отражение того, что происходит в государстве": еще одна грустная сага об". antikor.com.ua. November 2021.{{cite web}}: CS1 maint: url-status (link)
  3. "Object of unfinished construction - mine No. 10 "Novovolynska"". www.spfu.gov.ua. Retrieved January 2024. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  4. 4.0 4.1 "Волинську шахту збираються закривати? За 5,6 мільйона замовили дослідження про недоцільність добудови". sylapravdy.com. October 2023.{{cite web}}: CS1 maint: url-status (link)
  5. "ШАХТУ №10 «НОВОВОЛИНСЬКА» ХОЧУТЬ ПРИВАТИЗУВАТИ?". www.volynnews.com. January 2024.{{cite web}}: CS1 maint: url-status (link)
  6. "Гузь просить передбачити у держбюджеті 300 млн грн для введення в експлуатацію шахти №10 «Нововолинська»". bug.org.ua. October 2024.{{cite web}}: CS1 maint: url-status (link)