Nubaria–Sadat Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Nubaria–Sadat Gas Pipeline (خط غاز النوبارية - السادات) is an operating gas pipeline in Egypt.[1][2][3]

Location

The pipeline runs from El Noubareya, Alexandra to El Sadat, Monufia, Egypt.[1]

Loading map...

Project details

  • Operator:
  • Owner: Egyptian Natural Gas Holding Company [100%][2]
  • Parent company: Egyptian Natural Gas Holding Company [100%][2]
  • Capacity: 12 MMSCMD[2]
  • Length: 70 km[2]
  • Diameter: 36 in[1]
  • Status: Operating[2]
  • Start year: 2014[2]
  • Cost: 495 million EGP[1]
  • Financing:
  • Associated infrastructure:

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "إتمام خطي أنابيب نقل الغاز النوبارية/السادات بتكلفة 590 مليون جنيه - جريدة المال". جريدة المال (in العربية). 2014-10-03. Retrieved 2022-09-15.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 "https://www.petroleum.gov.eg/ar-eg/gas-and-petrol/distribution-marketing-transporting/Documents/2020%D8%AE%D8%B7%D9%88%D8%B7_%D8%A7%D9%84%D8%B4%D8%A8%D9%83%D8%A9_%D8%A7%D9%84%D9%82%D9%88%D9%85%D9%8A%D8%A9_%D9%84%D9%84%D8%BA%D8%A7%D8%B2%D8%A7%D8%AA_%D8%A7%D9%84%D8%B7%D8%A8%D9%8A%D8%B9%D9%8A%D8%A9.pdf" (PDF). Retrieved 2022-09-15. {{cite web}}: External link in |title= (help)CS1 maint: url-status (link)
  3. Egypt's Projects Map. "خط غاز النوبارية - السادات". egy-map.com. Retrieved 2022-09-15.