Nudo Mudéjar de Andorra solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Plan Futuro Andorra, Futur-e Plan
Nudo Mudéjar de Andorra solar farm is a solar photovoltaic (PV) farm in pre-construction in Andorra-Sierra de Arcos, Teruel, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Nudo Mudéjar de Andorra solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
Calanda | Pre-construction[1][2][3] | 2027 (planned)[3] | 49.9 MWp/dc[1][4] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
Calandrias | Pre-construction[1][2][3] | 2027 (planned)[3] | 480.6 MWp/dc[1][4] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
El Tambor | Pre-construction[1][2][3] | 2027 (planned)[3] | 75 MWp/dc[1] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
Regallo | Pre-construction[1][2][3] | 2027 (planned)[3] | 174 MWp/dc[1] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
San Macario | Pre-construction[1][2][3] | 2027 (planned)[3] | 74.2 MWp/dc[1][4] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
San Martín | Pre-construction[1][2][3] | 2027 (planned)[3] | 250.6 MWp/dc[1][4] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
Santa Maria | Pre-construction[1][2][3] | 2027 (planned)[3] | 99.4 MWp/dc[1][4] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Nudo Mudéjar de Andorra solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
Calanda | Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] | 40.9959, -0.3814 (approximate)[1] |
Calandrias | Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] | 40.9959, -0.3814 (approximate)[1] |
El Tambor | Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] | 40.9959, -0.3814 (approximate)[1] |
Regallo | Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] | 40.9959, -0.3814 (approximate)[1] |
San Macario | Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] | 40.9959, -0.3814 (approximate)[1] |
San Martín | Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] | 40.9959, -0.3814 (approximate)[1] |
Santa Maria | Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] | 40.9959, -0.3814 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 https://web.archive.org/web/20240126052142/https://www.endesa.com/es/prensa/sala-de-prensa/noticias/transicion-energetica/endesa-presenta-plan-futuro-andorra-dejara-dentro-5-anos-500-empleos-fijos. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240219020828/https://www.diariodeteruel.es/bajoaragon/el-macroproyecto-de-renovables-de-endesa-para-el-nudo-de-andorra-sera-admitido-a-tramite-en-febrero. Archived from the original on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 https://www.heraldo.es/noticias/aragon/teruel/2023/11/29/endesa-aumenta-la-inversion-en-nudo-mudejar-de-andorra-en-200-millones-1694238.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240219020807/https://elperiodicodelaenergia.com/el-megaplan-de-endesa-para-andorra-teruel-1-500-mw-de-renovables-la-mayor-bateria-de-espana-hidrogeno-y-el-uso-de-compensadores-sincronos/. Archived from the original on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help)