Nudo Mudéjar de Andorra solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Plan Futuro Andorra, Futur-e Plan

Nudo Mudéjar de Andorra solar farm is a solar photovoltaic (PV) farm in pre-construction in Andorra-Sierra de Arcos, Teruel, Aragón, Spain.

Project Details

Table 1: Phase-level project details for Nudo Mudéjar de Andorra solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
Calanda Pre-construction[1][2][3] 2027 (planned)[3] 49.9 MWp/dc[1][4] PV[1] Endesa SA [100%][1] Endesa[1]
Calandrias Pre-construction[1][2][3] 2027 (planned)[3] 480.6 MWp/dc[1][4] PV[1] Endesa SA [100%][1] Endesa[1]
El Tambor Pre-construction[1][2][3] 2027 (planned)[3] 75 MWp/dc[1] PV[1] Endesa SA [100%][1] Endesa[1]
Regallo Pre-construction[1][2][3] 2027 (planned)[3] 174 MWp/dc[1] PV[1] Endesa SA [100%][1] Endesa[1]
San Macario Pre-construction[1][2][3] 2027 (planned)[3] 74.2 MWp/dc[1][4] PV[1] Endesa SA [100%][1] Endesa[1]
San Martín Pre-construction[1][2][3] 2027 (planned)[3] 250.6 MWp/dc[1][4] PV[1] Endesa SA [100%][1] Endesa[1]
Santa Maria Pre-construction[1][2][3] 2027 (planned)[3] 99.4 MWp/dc[1][4] PV[1] Endesa SA [100%][1] Endesa[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Nudo Mudéjar de Andorra solar farm

Phase Name Location Coordinates (WGS 84)
Calanda Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] 40.9959, -0.3814 (approximate)[1]
Calandrias Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] 40.9959, -0.3814 (approximate)[1]
El Tambor Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] 40.9959, -0.3814 (approximate)[1]
Regallo Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] 40.9959, -0.3814 (approximate)[1]
San Macario Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] 40.9959, -0.3814 (approximate)[1]
San Martín Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] 40.9959, -0.3814 (approximate)[1]
Santa Maria Andorra-Sierra de Arcos, Teruel, Aragón, Spain[1] 40.9959, -0.3814 (approximate)[1]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 https://web.archive.org/web/20240126052142/https://www.endesa.com/es/prensa/sala-de-prensa/noticias/transicion-energetica/endesa-presenta-plan-futuro-andorra-dejara-dentro-5-anos-500-empleos-fijos. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240219020828/https://www.diariodeteruel.es/bajoaragon/el-macroproyecto-de-renovables-de-endesa-para-el-nudo-de-andorra-sera-admitido-a-tramite-en-febrero. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 https://www.heraldo.es/noticias/aragon/teruel/2023/11/29/endesa-aumenta-la-inversion-en-nudo-mudejar-de-andorra-en-200-millones-1694238.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240219020807/https://elperiodicodelaenergia.com/el-megaplan-de-endesa-para-andorra-teruel-1-500-mw-de-renovables-la-mayor-bateria-de-espana-hidrogeno-y-el-uso-de-compensadores-sincronos/. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)