Obed Meadow Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Obed Meadow Solar is a solar photovoltaic (PV) farm in pre-construction in Navajo County, Arizona, United States.
Project Details
Table 1: Phase-level project details for Obed Meadow Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Pre-construction[1] | 2025 (planned)[2] | 200 MW[3] | PV[3] | Avangrid Renewables LLC [100%][3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Obed Meadow Solar
Location | Coordinates (WGS 84) |
---|---|
Navajo County, Arizona, United States[3] | 34.9362, -110.3256 (approximate)[3] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20240206145014/https://www.obedmeadowsolar.com/wp-content/uploads/2022/04/ObedMeadow_VirtualOpenHousePresentation.pdf. Archived from the original (PDF) on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://obedmeadowsolar.com/wp-content/uploads/2023/04/Obed_Meadow_Solar_April2023_Community_Meeting_Boards-1.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240201192320/https://obedmeadowsolar.com/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)