Ockendon Landfill solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Ockendon Solar
Ockendon Landfill solar farm is an operating solar photovoltaic (PV) farm in Thurrock, Eastern, England, United Kingdom.
Project Details
Table 1: Phase-level project details for Ockendon Landfill solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2023[1] | 38 MWp/dc[1] | PV[1] | NTR PLC [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Ockendon Landfill solar farm
Location | Coordinates (WGS 84) |
---|---|
Thurrock, Eastern, England, United Kingdom[1] | 51.5262, 0.3191 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20240327051815/https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract. Archived from the original on 27 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207072335/https://www.energyglobal.com/solar/01092022/ntr-begins-construction-of-ockendon-solar-project/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)