Oliver County Wind Energy Center

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: FPL Energy Oliver (Phases 1, 2)

Oliver County Wind Energy Center is an operating wind farm in Oliver County, North Dakota, United States.

Project Details

Table 1: Phase-level project details for Oliver County Wind Energy Center

Phase name Status Commissioning year Retired year Nameplate capacity Type Owner Operator
1 Retired[1] 2006[2] 2020[1] 51 MW[3] Onshore[3] NextEra Energy Inc [100%][4] NextEra Energy[4]
2 Retired[1] 2007[2] 2020[1] 48 MW[3] Onshore[3] NextEra Energy Inc [100%][4] NextEra Energy[4]
3 Operating[2] 2017[2] 99 MW[3] Onshore[3] NextEra Energy Inc [100%][4] NextEra Energy[4]
4 Construction[5] 202 MW[6] Onshore[6] NextEra Energy Inc [100%][6]
RP1 Operating[1] 2020[1] 51 MW[1] Onshore[3] NextEra Energy Inc[4]
RP2 Operating[1] 2020[1] 51 MW[1] Onshore[3] NextEra Energy Inc[4]

Location

Table 2: Phase-level location details for Oliver County Wind Energy Center

Phase Name Location Coordinates (WGS 84)
1 Oliver County, North Dakota, United States[3] 47.1414, -101.2260 (exact)[3]
2 Oliver County, North Dakota, United States[3] 47.1582, -101.2870 (exact)[3]
3 Morton County, North Dakota, United States[3] 46.9674, -101.1530 (exact)[3]
4 United States[6] 47.1071, -101.3343 (approximate)[6]
RP1 United States[3] 47.1414, -101.2260 (exact)[3]
RP2 United States[3] 47.1582, -101.2870 (exact)[3]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 https://web.archive.org/web/20240125152732/https://www.fakeaddress.com/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20240131022710/https://www.nexteraenergyresources.com/content/dam/neer/us/en/pdf/portfolio/oliver.pdf. Archived from the original (PDF) on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  5. https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860m/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 https://web.archive.org/web/20240125181230/https://www.nexteraenergyresources.com/oliver-wind/project-overview.html. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)