Olonets-Pitkyaranta Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Olonets-Pitkyaranta Gas Pipeline (Russian: Газопровод-отвод Олонец - ГРС Питкяранта) is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to run from Olonets gas distribution station, Republic of Karelia to Pitkyaranta gas distribution station, Republic of Karelia, Russia.
Project details
- Operator:
- Owner: Gazprom[1]
- Parent company: Gazprom
- Capacity: 0.546 bcm/year[2]
- Length: 122.75 km[2]
- Diameter: 325 mm[3]
- Status: Proposed[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Background
The Olonets-Pitkyaranta Gas Pipeline, which is a distribution pipeline, was included in the gasification program of Gazprom for 2021-2025 for the Republic of Karelia.[1] The construction began in 2021 and is expected to end in 2023.[4] As of August 2023, the pipeline has not been commissioned yet.[5]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "Программа газификации 2021–2025 в Республике Карелия". Gazprommap.ru. 2022. Retrieved Jul 26, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 "В Карелии будут построены газопровод-отвод и ГРС Питкяранта" (in русский). Retrieved 2022-08-08.
- ↑ "Распоряжение Правительства РФ от 31 января 2017 г. N 166-р О внесении изменений в распоряжение Правительства РФ от 6 мая 2015 г. N 816-р". Retrieved 2022-08-08.
{{cite news}}
: no-break space character in|title=
at position 48 (help) - ↑ "Дан старт строительству газопровода «Олонец – Питкяранта»". Официальный интернет-портал Республики Карелия. September 7, 2021. Retrieved August 1, 2023.
{{cite web}}
: line feed character in|website=
at position 28 (help)CS1 maint: url-status (link) - ↑ "Программа развития газоснабжения и газификации Карелии актуализирована". rk.karelia.ru. April 4, 2023. Retrieved August 1, 2023.
{{cite web}}
: CS1 maint: url-status (link)