Oradea solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Oradea solar farm is a solar photovoltaic (PV) farm under construction in Oradea, Bihor, Romania.
Project Details
Table 1: Phase-level project details for Oradea solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Construction[1] | 2024 (planned)[1] | 87 MW[2] | PV[2] | Econergy [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Oradea solar farm
Location | Coordinates (WGS 84) |
---|---|
Oradea, Bihor, Romania[2] | 47.0435, 21.9197 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 (PDF) https://web.archive.org/web/20240218232848/https://econergy.b-cdn.net/wp-content/uploads/2023/11/Q3-2023-PPT-in-English-Final-Version-3.pdf. Archived from the original (PDF) on 18 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240201215703/https://www.econergytech.com/projects/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)