Oradea solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Oradea solar farm is a solar photovoltaic (PV) farm under construction in Oradea, Bihor, Romania.

Project Details

Table 1: Phase-level project details for Oradea solar farm

Status Commissioning year Nameplate capacity Technology Owner
Construction[1] 2024 (planned)[1] 87 MW[2] PV[2] Econergy [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Oradea solar farm

Location Coordinates (WGS 84)
Oradea, Bihor, Romania[2] 47.0435, 21.9197 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://web.archive.org/web/20240218232848/https://econergy.b-cdn.net/wp-content/uploads/2023/11/Q3-2023-PPT-in-English-Final-Version-3.pdf. Archived from the original (PDF) on 18 February 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240201215703/https://www.econergytech.com/projects/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)