Oryx Oil and Gas Field is an operating oil and gas field in Chad.
Project Details
Main Data
Table 1: Field-level project details for Oryx Oil and Gas Field
*Final Investment Decision
Unit name
|
Status
|
Operator
|
Owner
|
Discovery year
|
FID* year
|
Production start year
|
Oryx
|
Operating[1]
|
CPC Corporation Taiwan[2]
|
Societe des Hydrocarbures du Tchad S.A. (30.0%); CPC Corporation Taiwan (35.0%); CEFC China Energy (35.0%)[1]
|
–
|
–
|
2020[2]
|
Production and Reserves
Table 2: Reserves of Oryx Oil and Gas Field
million bbl = million barrels of oil
Fuel Description
|
Reserve Classification
|
Quantity
|
Units
|
Data Year
|
Source
|
crude oil and condensate
|
Remaining recoverable reserves
|
33.48
|
million bbl
|
2021
|
[1]
|
Table 3: Production from Oryx Oil and Gas Field
million bbl/y = million barrels of oil per year
Category
|
Fuel Description
|
Quantity
|
Units
|
Data Year
|
Source
|
production design capacity
|
crude oil and condensate
|
3.5
|
million bbl/y
|
2022
|
[1]
|
Location
Table 4: field-level location details for Oryx Oil and Gas Field
Location
|
Coordinates (WGS 84)
|
Onshore, Chad
|
No location data found
|
Articles and Resources
Additional data
To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.
References