Osterild Testing Center wind farm is an operating wind farm in North Denmark Region, Denmark.

Project Details

Table 1: Phase-level project details for Osterild Testing Center wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
11 Operating[1] 15 MW[1] Onshore[1] Vestas[1]
12 Operating[1] 14 MW[1] Onshore[1]
7 Operating[2] 2021[2] 14 MW[2] Onshore[2] Siemens Gamesa Renewable Energy SA [100%] (Siemens Gamesa Renewable Energy Siemens Gamesa Ανανεωσιμη Ενεργεια Ανωμυμη Εταιρεια)[2] Technical University of Denmark (DTU)[3]
8 Operating[4] 2020[4] 10 MW[4] Onshore[4] Siemens Gamesa Renewable Energy SA [100%] (Siemens Gamesa Renewable Energy Siemens Gamesa Ανανεωσιμη Ενεργεια Ανωμυμη Εταιρεια)[5] Technical University of Denmark (DTU)[5]

Location

Table 2: Phase-level location details for Osterild Testing Center wind farm

Phase Name Location Coordinates (WGS 84)
11 North Denmark Region, Denmark[4] 57.0465, 8.8834 (exact)[4]
12 North Denmark Region, Denmark[4] 57.0465, 8.8834 (exact)[4]
7 North Denmark Region, Denmark[4] 57.0465, 8.8834 (exact)[4]
8 North Denmark Region, Denmark[4] 57.0465, 8.8834 (exact)[4]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240421040153/https://www.thewindpower.net/windfarm_en_22396_osterild.php. Archived from the original on 21 April 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240125212422/https://www.offshorewind.biz/2021/10/27/siemens-gamesa-installs-14-mw-wind-turbine-nacelle-prototype/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240131043822/https://wind.dtu.dk/Facilities. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 https://web.archive.org/web/20240125152647/https://ens.dk/sites/ens.dk/files/Statistik/anlaegprod_0.xlsx. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://web.archive.org/web/20240131044002/https://ens.dk/sites/ens.dk/files/Globalcooperation/report_on_oesterild_test_centre_-_lessons_learned.pdf. Archived from the original (PDF) on 31 January 2024. {{cite web}}: Missing or empty |title= (help)