Ovidiopol Libental wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Ovidiopol Libental wind farm is a wind farm in Libental, Ovidiopolsky district, Odessa Oblast, Ukraine.
Project Details
Table 1: Phase-level project details for Ovidiopol Libental wind farm
Phase name | Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
1 | Cancelled (inferred March 2024) | 120 MW[1] | Onshore[2] | NOTUS Energy [100%][1] | NOTUS Energy[1] |
Location
Table 2: Phase-level location details for Ovidiopol Libental wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Libental, Ovidiopolsky district, Odessa Oblast, Ukraine[3] | 46.2447, 30.4447 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20240126060242/https://renews.biz/59265/german-developer-signs-300mw-ukraine-wind-pact/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126111929/https://www.notus.de/en/projekt-neuigkeiten/notus-energy-and-odessa-state-regional-government-sign-declaration-construction. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240201025021/https://www.thewindpower.net/windfarm_en_20049_ovid.php. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)