Oweninny wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Oweninny wind farm is an operating wind farm in Bangor Erris, Mayo, Connacht, Ireland.
Project Details
Table 1: Phase-level project details for Oweninny wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2019[1] | 93 MW[1] | Onshore[2] | Bord na Móna PLC; ESB Group[3][3] |
2 | Construction[4][5] | – | 83 MW[3] | Onshore[2] | Bord na Móna PLC; ESB Group[3][3] |
3 | Pre-construction[6][7] | – | 90 MW[6] | Onshore[8] | Bord na Móna PLC [100%][6] |
Location
Table 2: Phase-level location details for Oweninny wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Bangor Erris, Mayo, Connacht, Ireland[1] | 54.1444, -9.7427 (approximate)[1] |
2 | Bangor Erris, Mayo, Connacht, Ireland[3] | 54.1444, -9.7427 (approximate)[3] |
3 | Bellacorrick, Mayo, Connacht, Ireland[6] | 54.1203, -9.5649 (approximate)[6] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240126020636/https://www.oweninnywindfarm.ie/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240126104621/https://www.oweninnywindfarm.ie/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20240126020653/https://renews.biz/72456/esb-bord-na-mona-seal-finance-for-83mw-oweninny-2/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126141228/https://renews.biz/70404/oweninny-2-enters-construction-phase-in-ireland/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.oweninnywindfarmphasethreeplanning.ie/wp-content/uploads/sites/37/2023/04/Appendix_3_1_Construction_Environmental_Management_Plan.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 (PDF) https://web.archive.org/web/20240126020611/https://www.oweninnywindfarmphasethree.ie/wp-content/uploads/sites/15/2020/12/OW3_Brochure.pdf. Archived from the original (PDF) on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.bordnamona.ie/bord-na-mona-to-raise-e1-6-billion-for-climate-action-projects/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240126104852/https://www.oweninnywindfarmphasethree.ie/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help)