Pabna (BCPCL) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Sagarkandi solar farm, Sagarkandi union solar farm, Pabna 64.55 MW Solar Park Project

Pabna (BCPCL) solar farm is a solar photovoltaic (PV) farm under construction in Pabna district, Rajshahi Division, Bangladesh.

Project Details

Table 1: Phase-level project details for Pabna (BCPCL) solar farm

Status Commissioning year Nameplate capacity Technology Owner
Construction[1] 2024 (planned)[1] 84 MWp/dc[1] PV[1] Bangladesh China Renewable Energy Company LTD (BCPCL)[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Pabna (BCPCL) solar farm

Location Coordinates (WGS 84)
Pabna district, Rajshahi Division, Bangladesh[1] 23.8252, 89.6107 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://ndre.sreda.gov.bd/index.php?id=06&kid=4250. {{cite web}}: Missing or empty |title= (help)
  2. http://web.archive.org/web/20211105151634/https://renewablesnow.com/news/bangladesh-china-jv-seeks-epc-for-60-mw-solar-project-758356/. {{cite web}}: Missing or empty |title= (help)