Pampa Unión Solar Plant

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Cerro Dominador Solar Complex, Atacama 2 (Phase 1)

Pampa Unión Solar Plant (Planta Solar Pampa Unión Extensión, Atacama 2 Solar Power Plant, Planta Solar Pampa Unión) is a solar photovoltaic (PV) farm in pre-construction in Sierra Gorda, Antofagasta, Chile.

Project Details

Table 1: Phase-level project details for Pampa Unión Solar Plant

Phase name Status Nameplate capacity Technology Owner Operator
PV (Extension) Pre-construction[1] 600 MW[2] PV[3] EIG Global Energy Partners LLC [100%][4] EIG Global Energy Partners[4]
Solar Thermal Cancelled[3] 110 MW[3] PV[3] Grupo Cerro [100%][5] Grupo Cerro[5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Pampa Unión Solar Plant

Phase Name Location Coordinates (WGS 84)
PV (Extension) Sierra Gorda, Antofagasta, Chile[4] -23.0036, -69.1511 (approximate)[4]
Solar Thermal Sierra Gorda, Antofagasta, Chile[4] -23.0036, -69.1511 (approximate)[4]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://energia.gob.cl/sites/default/files/compendio_cartografico_junio_2024.pdf https://catastro.coordinador.cl/buscador, https://energia.gob.cl/sites/default/files/compendio_cartografico_junio_2024.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. (PDF) https://energia.gob.cl/sites/default/files/compendio_cartografico_junio_2024.pdf http://generadoras.cl/prensa/proyecto-fotovoltaico-pampa-union-del-grupo-cerro-dominador-consigue-aprobacion-ambiental-para-aumentar-capacidad-de-generacion-a-600-mw, https://energia.gob.cl/sites/default/files/compendio_cartografico_junio_2024.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240207120444/https://generadoras.cl/prensa/proyecto-fotovoltaico-pampa-union-del-grupo-cerro-dominador-consigue-aprobacion-ambiental-para-aumentar-capacidad-de-generacion-a-600-mw. Archived from the original on 2024-02-07. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20210609235450/https://cerrodominador.com/proyectos/. Archived from the original on 09 June 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://eigpartners.com/eig-launces-chilean-renewables-platform-grupo-cerro/. {{cite web}}: Missing or empty |title= (help)