Panchagarh (8Minutenergy) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: 50 MW Solar Park by 8minutenergy Singapore Holdings 2 Pte. Ltd. Singapore

Panchagarh (8Minutenergy) solar farm is a solar photovoltaic (PV) farm in pre-construction in Panchagarh district, Rangpur Division, Bangladesh.

Project Details

Table 1: Phase-level project details for Panchagarh (8Minutenergy) solar farm

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2024 (planned)[2] 50 MWp/dc[1] PV[1] 8minutenergy Singapore Holdings PTE LTD (8MINUTENERGY)[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Panchagarh (8Minutenergy) solar farm

Location Coordinates (WGS 84)
Panchagarh district, Rangpur Division, Bangladesh[1] 26.1307, 88.7084 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://ndre.sreda.gov.bd/index.php?id=06&kid=341. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://bpdb.portal.gov.bd/sites/default/files/files/bpdb.portal.gov.bd/annual_reports/7b792f67_bf50_4b3d_9bef_8f9b568005c9/2022-11-29-05-22-0dea17e09d8a84e72a63312df6b5bdc6.pdf. {{cite web}}: Missing or empty |title= (help)
  3. https://store.globaldata.com/report/gd-218838--8minutenergy-panchagarh-solar-power-plant-50-mw-rangpur/. {{cite web}}: Missing or empty |title= (help)