Paoni-Il Coal Mine

From Global Energy Monitor
This article is part of the
Global Coal Mine Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:
Related-articles:

Paoni-Il Coal Mine is an operating coal mine in Sakhri, Chandrapur, Maharashtra, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Paoni-Il Coal Mine Sakhri, Chandrapur, Maharashtra, India 19.82705027, 79.25526677 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating 2007

Table 3: Operation details

Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
3.25[1] 3.24997[2] 2022[2] Surface Open Pit 11 200 945

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
30.63 Wardha Valley Subbituminous Thermal Dhopave Thermal Power Station (Mahagenco)

Table 5: Ownership and parent company

Owner Parent Company Headquarters
Western Coalfields Ltd[3] Coal India India

Table 6: Historical production (unit: million tonnes per annum)

ROM or Saleable 2017 2018 2019 2020 2021 2022 2023
ROM 0.306[4] 0.599[4] 2.105[4] 2.8[4] 3.249[4] 3.25[4] 3.24[5]

Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.

Background on Mine

The Pauni-II Expansion Opencast Coal Mine has a capacity of 3.25 million tonnes on 1095.52 ha. It is located near Village Sakhri, Tehsil Rajura, District Chandrapur in the State of Maharashtra, India. Pauni-II Opencast coal mine in Ballarpur coal area had earlier received Environemnt Clearance for 0.6 MTPA on 2 February, 2006 on a mining lease area of 316.30 ha.[6]

The public hearing for the Pauni-II expansion project was conducted on 1 December 2018. A total of 954 families will be affected due to land acquisition of 718.69 ha agricutlural land. The Project received its environment clearance on 28 March 2019 from MoEF&CC India for one year to be extended after submitting compliance report. The main consumers of the mine are thermal plants of MAHAGENCO, KPCL, GSCCL and miscellaneous consumers.[7]

Expansion Details

  • Status:
  • Size of Expansion:
  • Permits and Applications:

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://web.archive.org/web/20241003063558/http://www.westerncoal.in/images/exp_pauni_II_oc_13-03-2020.pdf. Archived from the original (PDF) on 03 October 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://coal.nic.in/sites/default/files/2023-05/srn-march-2023_0.pdf. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20240723001427/http://www.westerncoal.in/images/grade_2021_22.pdf. Archived from the original (PDF) on 23 July 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 (PDF) http://www.westerncoal.in/images/Pauni%20II%20OC-2023.pdf. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://web.archive.org/web/20240613224926/https://coal.nic.in/sites/default/files/2024-05/srn-march-2024.pdf. Archived from the original (PDF) on 13 June 2024. {{cite web}}: Missing or empty |title= (help)
  6. List of Environment Clearances for WCL Projects
  7. Environment Clearance for Pauni-II Expansion Opencast Coal Mine, MoEF&CC India, 28 March, 2019