Paracel power station (Planta de biomasa Paracel) is a power station in pre-construction in Laguna Plato, Concepción, Paraguay.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Paracel power station Laguna Plato, Concepción, Paraguay -23.26, -57.4975 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Start year
1 Pre-construction[2][3] bioenergy: paper mill wastes[4] 220[4][5][6] 2027 (planned)[7][2][3]

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 Paracel[4] Paracel SA [100%][4] Zapag Group [50.0%]; Girindus Investments AB [44.7%]; Heinzel Holding GmbH [5.3%]

Articles and Resources

References

  1. https://web.archive.org/web/20221207182003/https://www.google.com/maps/place/F%C3%A1brica+Paracel/@-24.370665,-58.6724177,697709m/data=!3m1!1e3!4m6!3m5!1s0x94642fd951c74057:0x19ce77a2bec224d4!8m2!3d-23.2598707!4d-57.4975812!15sChBGw6FicmljYSBQYXJhY2VskgEMbWFudWZhY3R1cmVy4AEA?shorturl=1. Archived from the original on 07 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20230524193419/https://www.bloomberg.com/news/articles/2023-05-13/high-interest-rates-delay-paraguay-3-billion-wood-pulp-mill. Archived from the original on 24 May 2023. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240425130945/https://www.fastmarkets.com/insights/paracel-wood-new-bek-pulp-mill-2027-forest-productivity/. Archived from the original on 25 April 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20221207002144/https://paracel.com.py/en/sustainability/. Archived from the original on 07 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. https://web.archive.org/web/20221207002219/https://www.argentinaforestal.com/2022/06/28/celulosa-paracel/. Archived from the original on 07 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20221207002202/https://paracel.com.py/en/wp-content/uploads/2022/05/Volume-III_Environment-Impacts-Assessment_FINAL-JULY-rev-aug.pdf. Archived from the original (PDF) on 07 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. https://web.archive.org/web/20230625145604/https://www.argentinaforestal.com/2023/05/28/paraguay-posterga-inicio-de-obras-de-la-planta/. Archived from the original on 25 June 2023. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of bioenergy power stations, a downloadable dataset, and summary data, please visit the Global Bioenergy Power Tracker on the Global Energy Monitor website.