Paras power station is an operating power station of at least 500-megawatts (MW) in Paras, Balapur, Akola, Maharashtra, India with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Paras power station Paras, Balapur, Akola, Maharashtra, India 20.7147, 76.7948 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 2, Unit 3, Unit 4, Unit 5: 20.7147, 76.7948

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 2 retired coal: bituminous 62.5 subcritical 1967 2010
Unit 3 operating coal: bituminous 250 subcritical 2007
Unit 4 operating coal: bituminous 250 subcritical 2010
Unit 5 cancelled coal: bituminous 250 subcritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 2 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]
Unit 3 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]
Unit 4 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]
Unit 5 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Financing

Source of financing:

Background

The plant is operated by Maharashtra State Power Generation Company (Mahagenco). It is a subcritical plant.

It consisted of four units, but the first two units have been retired:[1][2]

  • Unit 1 - 30 MW - 1961 (decommissioned 1991)
  • Unit 2 - 62.5 MW - 1967 (decommissioned 2010)
  • Unit 3 - 250 MW - 2007
  • Unit 4 - 250 MW - 2010

Unit 5: 250 MW Expansion

Mahagenco is planning to install a 250 MW unit at the same location as the existing plant. In January 2014 the company described the status of the project as follows:[3]

  • Land: Land acquisition for power house and ash disposal area is completed.
  • Water: Available from lower Mun barrage.
  • Fuel : MahaGuj has, vide letter dtd. 18th May, 2011, assured supply of coal to this project from Machhakata coal blocks. Further, GoI Vide Letter dtd 06.09.2013 have allocated Coal block of Mahajanwadi, Nagpur for this project.
  • MoE&F clearance: The Terms of Reference (TOR) is received from Ministry of Environment & Forests, Govt. of India on 26.09.2012. Final EIA report awaited from NEERI.
  • Power Purchase Agreement: MERC vide order dtd. 29.10.2013 accorded approval to amend PPA dtd. 01.04.2009 with MSEDCL for addition of this project in existing PPA.
  • Follow up with GoM for approval of the project is going on.

In July 2014 the company said environmental clearance was "pending due to coal analysis report of the revised coal linkage."[4]

The company received a new Terms of Reference in October 2015.[5]

As of January 2020 there have been no further developments, and the project appears to be deferred or abandoned.

Articles and Resources

References

  1. "Paras Coal Power Station India," Global Energy Observatory, accessed April 2014
  2. "Paras Extension Coal Power Station India," Global Energy Observatory, accessed April 2014
  3. "Future Projects (6090 MW)," Mahagenco, Accessed January 8, 2014
  4. "Future Projects (6090 MW)," Mahagenco, 16.07.2014
  5. Terms of Reference, India MoEF, Oct 16, 2015

Additional data