Patuca 2B hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Patuca 2B hydroelectric plant (Central Hidroeléctrica Patuca 2B) is a hydroelectric power plant in pre-construction in Valencia, Olancho, Honduras.

Project Details

Table 1: Project details for Patuca 2B hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner
Pre-construction[1] 2026 (planned)[1] 270 MW[2] 3[1] Conventional storage[2] Empresa Nacional de Energía Eléctrica (ENEE)[3]

Location

Table 2: Location details for Patuca 2B hydroelectric plant

Location River Coordinates (WGS 84)
Valencia, Olancho, Honduras[2] Río Patuca[2] 14.8211, -85.955 (approximate)[2]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://www.power-technology.com/data-insights/power-plant-profile-patuca-ii-b-honduras/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20220505224012/https://ingenieriareal.com/megaproyecto-hidroelectrico-patuca-i-ii-y-iii/. Archived from the original on 05 May 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. https://web.archive.org/web/20220624152119/https://www.bnamericas.com/en/news/honduras-issues-consultancy-call-to-help-refine-planned-hydropower-projects. Archived from the original on 24 June 2022. {{cite web}}: Missing or empty |title= (help)