Patuha geothermal power plant

From Global Energy Monitor
This article is part of the
Global Geothermal Power Tracker, a Global Energy Monitor project.
Report an error

Patuha geothermal power plant is an operating geothermal power plant in Bandung, Bandung Regency, West Java, Indonesia.

Project Details

Table 1: Unit-level project details for Patuha geothermal power plant

Unit name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2014[2] 55 MW[1] Flash steam - single[1] PT Geo Dipa Energi (GDE) [100%][3] PT Geo Dipa Energi (GDE)[3]
2 Construction[3] 2025 (planned)[4] 55 MW[3] Unknown type PT Geo Dipa Energi (GDE) [100%][2] PT Geo Dipa Energi (GDE)[3]
3 Announced[2] 2025 (planned)[5] 55 MW[2] Unknown type PT Geo Dipa Energi (GDE) [100%][2] PT Geo Dipa Energi (GDE)[2]
Future units Announced[5] 2030 (planned)[5] 290 MW[5] Unknown type PT Geo Dipa Energi (GDE) [100%][5] PT Geo Dipa Energi (GDE)[5]

Location

Table 2: Unit-level location details for Patuha geothermal power plant

Unit name Location Coordinates (WGS 84)
1 Bandung, Bandung Regency, West Java, Indonesia -7.1838, 107.4215 (exact)
2 Bandung, Bandung Regency, West Java, Indonesia -7.1838, 107.4215 (exact)
3 Bandung, Bandung Regency, West Java, Indonesia -7.1838, 107.4215 (exact)
Future units Bandung, Bandung Regency, West Java, Indonesia -7.1838, 107.4215 (exact)

The map below shows the exact locations of the geothermal power plant units:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20221108130549/http://thinkgeoenergy.com/map. Archived from the original on 08 November 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20221203163856/https://www.geodipa.co.id/bisnis-kami/lapangan-existing/. Archived from the original on 03 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20220407112849/https://www.thinkgeoenergy.com/construction-work-started-for-expansion-of-dieng-and-patuha-geothermal-plants/. Archived from the original on 07 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://www.petromindo.com/news/article/indonesia-geothermal-q3-update-sluggish-process-in-pursuing-the-2023-target. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20220225004901/https://www.thinkgeoenergy.com/pt-geo-dipa-energi-sets-ambitious-1020-mw-by-2035-development-target-in-indonesia/. Archived from the original on 25 February 2022. {{cite web}}: Missing or empty |title= (help)