Patuha geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Patuha geothermal power plant is an operating geothermal power plant in Bandung, Bandung Regency, West Java, Indonesia.
Project Details
Table 1: Unit-level project details for Patuha geothermal power plant
Unit name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2014[2] | 55 MW[1] | Flash steam - single[1] | PT Geo Dipa Energi (GDE) [100%][3] | PT Geo Dipa Energi (GDE)[3] |
2 | Construction[3] | 2025 (planned)[4] | 55 MW[3] | Unknown type | PT Geo Dipa Energi (GDE) [100%][2] | PT Geo Dipa Energi (GDE)[3] |
3 | Announced[2] | 2025 (planned)[5] | 55 MW[2] | Unknown type | PT Geo Dipa Energi (GDE) [100%][2] | PT Geo Dipa Energi (GDE)[2] |
Future units | Announced[5] | 2030 (planned)[5] | 290 MW[5] | Unknown type | PT Geo Dipa Energi (GDE) [100%][5] | PT Geo Dipa Energi (GDE)[5] |
Location
Table 2: Unit-level location details for Patuha geothermal power plant
Unit name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Bandung, Bandung Regency, West Java, Indonesia | -7.1838, 107.4215 (exact) |
2 | Bandung, Bandung Regency, West Java, Indonesia | -7.1838, 107.4215 (exact) |
3 | Bandung, Bandung Regency, West Java, Indonesia | -7.1838, 107.4215 (exact) |
Future units | Bandung, Bandung Regency, West Java, Indonesia | -7.1838, 107.4215 (exact) |
The map below shows the exact locations of the geothermal power plant units:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20221108130549/http://thinkgeoenergy.com/map. Archived from the original on 08 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20221203163856/https://www.geodipa.co.id/bisnis-kami/lapangan-existing/. Archived from the original on 03 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20220407112849/https://www.thinkgeoenergy.com/construction-work-started-for-expansion-of-dieng-and-patuha-geothermal-plants/. Archived from the original on 07 April 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.petromindo.com/news/article/indonesia-geothermal-q3-update-sluggish-process-in-pursuing-the-2023-target.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20220225004901/https://www.thinkgeoenergy.com/pt-geo-dipa-energi-sets-ambitious-1020-mw-by-2035-development-target-in-indonesia/. Archived from the original on 25 February 2022.
{{cite web}}
: Missing or empty|title=
(help)