Payra-Barishal-Gopalganj Gas Transmission Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Payra-Barishal-Gopalganj Gas Transmission Pipeline was a proposed gas pipeline in Bangladesh, which was later modified into Kuakata-PayraBarisal-Gopalganj-Pakirhat-Khulna Gas Transmission Pipeline[1]

Location

The pipeline would run from Payra Port to Gopalganj through Barishal, Bangladesh.[2][1]

Loading map...

Project Details

  • Operator: Gas Transmission Company Limited (GTCL) [2]
  • Owner: Gas Transmission Company Limited (GTCL) [2]
  • Parent company: Petrobangla [2]
  • Capacity:
  • Length: 153 km[2][1]
  • Diameter: 42 inches[2]
  • Status: Cancelled
  • Start year: 2025[2][1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The project has been proposed by GTCL, a subsidiary of Petrobangla.[2][1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 "Future Projects". GTCL.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "Annual Report 2020" (PDF). Petrobangla.{{cite web}}: CS1 maint: url-status (link)

Related SourceWatch articles

External resources

External articles