Payra LNG Terminal
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
Payra LNG Terminal was a proposed LNG terminal in Bangladesh. It was cancelled in August 2022.
Location
The terminal was proposed to be located in Kalapara Upazila - Patuakhali District, Barisal Division, Bangladesh.
Project details
- Operator:
- Owner:
- Parent company: Government of Bangladesh[1]
- Location: Payra Port, Kalapara Upazila - Patuakhali District, Barisal Division, Bangladesh[1]
- Coordinates: 21.999205, 90.305597 (exact)
- Capacity: 7.5 mtpa[1]
- Status: Cancelled[2]
- Type: Export/Import
- Start year:
- Cost:
- Financing:
- FID Status:
- Associated infrastructure: Payra LNG power station
Background
The import terminal was proposed to supply fuel to the Payra LNG power station.[1] They were proposed in 2017.[2]
In August 2022, the Bangladesh government cancelled the power station, and the LNG terminal is presumed to be cancelled as well.[2] The Payra LNG FSRU offshore import terminal is also proposed and appears to be unaffected by the cancellation of the onshore terminal.
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 "3600MW LNG-based power plant at Payra on cards". The Business Standard. 2019-07-25. Retrieved 2022-08-18.
- ↑ 2.0 2.1 2.2 Mohiuddin. "Govt backtracks from LNG-fired power plant". Prothomalo. Retrieved 2022-08-18.