Pecineaga wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Pecineaga wind farm is a wind farm under construction in Romania.
Project Details
Table 1: Phase-level project details for Pecineaga wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Construction[1] | 2025 (planned)[1] | 48 MW[2] | Onshore[2] | Eurowind Energy A/S [100%][2] | Siemens Gamesa Renewable Energy (Γκαμεσα Ενεργειακη Ελλας Α.Ε.)[2] |
Location
Table 2: Phase-level location details for Pecineaga wind farm
Location | Coordinates (WGS 84) |
---|---|
Romania[2] | 43.8959, 28.4944 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://balkangreenenergynews.com/eurowind-energy-starting-construction-of-48-mw-wind-farm-in-romania/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20240126040609/https://www.siemensgamesa.com/newsroom/2022/08/082222-siemens-gamesa-press-release-romania-onshore-eurowind-pecineaga. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help)