Pegadapalli (Jaipur Mandal) power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Pegadapalli (Jaipur Mandal) power station is an operating power station of at least 1200-megawatts (MW) in Pagadapalli, Jaipur, Adilabad, Telangana, India with multiple units, some of which are not currently operating. It is also known as Adilabad power station, Jaipur power station, Singareni power station.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Pegadapalli (Jaipur Mandal) power station | Pagadapalli, Jaipur, Adilabad, Telangana, India | 18.827056, 79.570284 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2, Unit 3, Unit 4: 18.827056, 79.570284
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 1 | Operating | coal: unknown | 600 | subcritical | 2016 |
Unit 2 | Operating | coal: unknown | 600 | subcritical | 2016 |
Unit 3 | Permitted | coal: unknown | 800 | supercritical | – |
Unit 4 | Announced[1] | coal: unknown | 800[1] | unknown | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | The Singareni Collieries Co Ltd [100%] | The Singareni Collieries Co Ltd [100.0%] |
Unit 2 | The Singareni Collieries Co Ltd [100%] | The Singareni Collieries Co Ltd [100.0%] |
Unit 3 | The Singareni Collieries Co Ltd [100%] | The Singareni Collieries Co Ltd [100.0%] |
Unit 4 | The Singareni Collieries Co Ltd [100%] | The Singareni Collieries Co Ltd [100.0%] |
Project-level coal details
- Coal source(s): Sriiampur coal fields, Naini coal mine, Odisha
- Permit(s): Environmental Clearance; Terms of Reference: 2015-05-27
Background
The coal-fired power station project was proposed by Singareni Collieries, India's second largest coal mining company. It was originally permitted as a 600 MW (2 x 300 MW) power station, according to the first Environmental Clearance issued October 28, 2009.[2]
In December 2010 a new Environmental Clearance was issued for a 1200 MW (2 x 600 MW) project.[3] Construction began in 2013.[4]
In April 2011, it was reported that Singareni Collieries had achieved financial closure for the $1.4-billion station, expected to be operational in April 2014. Of the 1200 MW, 150 MW would be earmarked for SCCL's use and the remaining 1050 MW would be sold to AP Transco.[5]
In March 2014 Singareni Collieries Company invited bids for construction of the 1200 MW power station.[6] Unit 1 is planned for commercial operation in March 2016 and unit 2 in June 2016.[7]
Unit 1 was synchronized in March 2016,[8] and began commercial operation in June 2016. Unit 2 was synchronized in June 2016,[9] and commissioned on November 25, 2016.[4]
Phase II expansion
In March 2015 Singareni Collieries submitted an application to add an additional unit 3 of 600 MW.[10] The project was granted a terms of reference on May 27, 2015.[11]
According to Singareni Collieries, the Telangana government directed the company to set up the additional unit to address energy shortages in the state.[12]
In April 2017 it was reported the unit would be 800 MW.[13] The terms of reference for the revised size was approved on May 14, 2018.[14] The EIA is for supercritical technology. Coal is planned to come from the proposed Naini coal mine in Odisha, with expected production in 2020-21.[15] Environmental clearance for the new 800 MW unit was granted on December 18, 2019.[16]
In January 2020, company officials said establishing the 800 MW unit was in the process of execution.[17]
In April 2022, the Board of Directors of Singareni Collieries Company Ltd (SCCL) approved the detailed project report (DPR) for the unit, estimated to cost ₹6,790 crore.[18]
The company planned to float tenders for the additional unit in January 2023 and expected construction to begin in March 2023.[19][20]
Planet imagery from April 2023 did not show evidence that construction of Unit 3 had begun.
In April 2023, a new article reported that the tendering procedure for the expansion project was nearly complete, and that construction would begin the following month, in May 2023.[21]
In May 2023, it was reported that construction of the expansion unit was estimated to commence in July of the same year. According to the news report, SCCL expected to have the unit completed in four to five years. [22] SCCL's 2022-2023 Annual Report (published September 2023) stated that a power purchase agreement (PPA) for the third unit was in progress and that "pre-award Consultancy work" had been awarded to NTPC.[23]
Reporting in January 2024 stated that the expansion unit's tendering process would be "completed soon."[24][25]
According to reporting from March 2024, the Telangana government planned to expand the existing 2 x 600 MW power station with two additional 800 MW units,[26] adding an apparent 800 MW Unit 4 to the proposed expansion.
Planet satellite imagery from April 2023 to April 2024 and August 2024 did not appear to show that construction of the new Unit 3 had begun.
As of September 2024, there were no apparent updates on a proposed Unit 4, and reporting at the time referenced only an 800 MW expansion at the power station.[27]
Opposition
In March 2018, villagers that would be displaced from the Pegapally plant staged a rasta roko on the National Highway-63 in India, causing traffic to come to standstill for over 30 minutes. They demanded jobs were given to the displaced villagers. 31 villagers spoke at the public hearing held by the Telangana Pollution Control Board in order to express their concerns too.[28]
The Ministry of Environment and Forests planned to visit the site of the Pegapally plant after a decision made on November 30, 2018. This decision came out of concerns around the pollution and ash from the power plant. The company in charge of the power plant, Singareni Collieries Company Ltd (SCCL) allegedly did not provide promised employments for displaced villagers and the people of Pegadapally, Jaipur, Elakanti, and Gangipally villages faced pollution.[29]
Alternatives
Meanwhile, in 2020, Singareni Collieries outlined plans to set up 800 MW of solar power projects in Telangana, which includes 500 MW of floating solar capacity, across its reservoir in thermal plant and other water bodies.[30]
Financing
Units 1-2: In April 2011, it was reported that Singareni Collieries had achieved financial closure for the station. Power Finance Corporation agreed to fund the total debt component of Rs 4000 crore, the remaining Rs 1900 crore will be from the company's internal accruals and borrowings.[31]
Unit 3: In April 2022, the Board of Directors of Singareni Collieries estimated the project cost at ₹6,790 crore (ca USD 810 million).[18]
Articles and Resources
References
- ↑ 1.0 1.1 https://www.thehindu.com/news/national/telangana/singareni-power-plant-to-be-expanded-with-another-1600-mw-capacity/article67943636.ece.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "J -13012/88/2008 -IA.II(T)," Environmental Clearance, Ministry of Environment and Forests, October 28, 2009
- ↑ "J-13012/88/2008-IA.II (T)," Environmental Clearance, Ministry of Environment and Forests, December 27, 2010
- ↑ 4.0 4.1 Monthly Broad Status Report, India Ministry of Power, November 2016
- ↑ "SSCL achieves financial closure for Adilabad power plant" IBN Live, April 1, 2011.
- ↑ "Bids invited for Singareni power project," Projects Today, March 12, 2014.
- ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," India CEA, November 2015
- ↑ "Singareni thermal power plant synchronised," Hans India, Mar 14, 2016
- ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, July 2016
- ↑ Form 1, India MoEF, Mar 12, 2015
- ↑ Terms of Reference, India MoEF, May 27, 2015
- ↑ "Application for Form 1," Singareni Collieries, March 10, 2015
- ↑ "SCCL power plant to get new arm," Telangana Today, Apr 2, 2017
- ↑ Terms of Reference, India MoEF, May 14, 2018
- ↑ EIA, Singareni Collieries, March 2018
- ↑ clearance, India MoEF, December 18, 2019
- ↑ "Singareni enters solar power generation," The Hindu, January 10, 2020
- ↑ 18.0 18.1 "SCCL Board approves DPR of 800 MW thermal unit in STPP," The Hindu, April 8, 2022
- ↑ "The remarkable rise of Singareni Thermal Power Station to the top," Telangana Today, January 5, 2023
- ↑ "SCCL will add an 800 MW power unit to the Jaipur coal-fired plant in India," Enerdata, January 11, 2023
- ↑ "SCCL sets power generation targets to 3,350 MW," ConstructionWorld, April 10, 2023
- ↑ "Singareni Collieries Expands Power Capacity with 800 MW Unit," ConstructionWorld, May 25, 2023
- ↑ 102nd Annual Report & Accounts, The Singareni Collieries Company Limited, September 2, 2023
- ↑ SCCL to take up solar energy projects, PYNR, January 7, 2024
- ↑ Singareni to explore setting up JV solar plants in other States, The Hindu, January 6, 2024
- ↑ “Singareni power plant to be expanded with another 1,600 MW capacity,” The Hindu, March 12, 2024
- ↑ “Singareni sets target to achieve Rs. 60,000 cr turnover in next 5 years,” Telangana Today, September 17, 2024
- ↑ “Singareni power project oustees seek jobs”, Telangana Today, March 7, 2018.
- ↑ “Panel to visit Singareni power project site to assess environmental provision”, The Hindu News, December 23, 2018.
- ↑ "Singareni Collieries plans 800-MW solar power project," The Hindu Business Line, July 31, 2020
- ↑ "State-run Singareni Collieries Company Ltd (SCCL) has achiev ." timesofindia.indiatimes.com. April 2011.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.