Pego Hybrid solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Pego Hybrid solar farm is an announced solar photovoltaic (PV) farm in Abrantes, Santarém, Portugal.
Project Details
Table 1: Phase-level project details for Pego Hybrid solar farm
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Announced[1] | 365 MW[1] | PV[1] | Endesa SA [100%][1] | Endesa[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Pego Hybrid solar farm
Location | Coordinates (WGS 84) |
---|---|
Abrantes, Santarém, Portugal[1] | 39.4611, -8.1383 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240201215425/https://www.pv-magazine.com/2022/03/28/endesa-plans-europes-largest-hybrid-wind-solar-storage-plant/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)